<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Dallas - File #: 25-2240A</title><link>https://cityofdallas.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7503402&amp;GUID=7E83E0AD-809A-4133-9273-B8B130A22B01</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cityofdallas.legistar.com/Feed.ashx?GUID=7E83E0AD-809A-4133-9273-B8B130A22B01&amp;ID=7503402&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Dallas - File #: 25-2240A</title><link>https://cityofdallas.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7503402&amp;GUID=7E83E0AD-809A-4133-9273-B8B130A22B01</link><guid isPermaLink="false">7E83E0AD-809A-4133-9273-B8B130A22B01-2025-11-17-19-59-53</guid><description>Title: Authorize a professional engineering services contract with AECOM Technical Services, Inc., most highly qualified proposer of three, to develop preliminary engineering (design schematics, environmental documents, and public involvement), plans, specifications, and estimates for the reconstruction of the intersection at Harry Hines Boulevard (Bridge) and Mockingbird Lane for CSJ 0918-47-484 - Not to exceed $3,067,635.47 - Financing: FY24 TxDOT Surface Transportation Block Grant Program Fund ($2,940,000.00), Street and Transportation (A) Fund (2024 General Obligation Bond Fund) ($59,663.15), Wastewater Capital Improvement G Fund ($33,986.16), and Water Capital Improvement G Fund ($33,986.16)</description><pubDate>Mon, 17 Nov 2025 19:59:53 GMT</pubDate></item></channel></rss>