Legislation Details

File #: 24-2286    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/22/2024 In control: Water Utilities Department
On agenda: 9/25/2024 Final action:
Title: Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC, to provide additional engineering services required for raw water facility major maintenance and rehabilitation improvements at the Bachman Water Treatment Plant and Tawakoni Balancing Reservoir - Not to exceed $3,175,021.00, from $8,481,480.00 to $11,656,501.00 - Financing: Water Capital Improvement F Fund ($2,000,000.00), Water Capital Improvement G Fund ($1,050,000.00), and Water Construction Fund ($125,021.00)
Indexes: 200, 6
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: September 25, 2024
COUNCIL DISTRICT(S): 6, Outside
DEPARTMENT: Water Utilities Department
EXECUTIVE: Dev Rastogi
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC, to provide additional engineering services required for raw water facility major maintenance and rehabilitation improvements at the Bachman Water Treatment Plant and Tawakoni Balancing Reservoir - Not to exceed $3,175,021.00, from $8,481,480.00 to $11,656,501.00 - Financing: Water Capital Improvement F Fund ($2,000,000.00), Water Capital Improvement G Fund ($1,050,000.00), and Water Construction Fund ($125,021.00)

Body
BACKGROUND

The initial phase of this project identified 10 raw water facilities for evaluation based on their age and condition, impact to system, reliability, cost to operate, and frequency of repairs. The facilities included intake structures, screening equipment, pump stations, valves, and pipelines located at the Tawakoni Balancing Reservoir and at intakes along the Elm Fork of the Trinity River and three Dallas Water Utilities (DWU) water supply reservoirs: Lake Ray Hubbard, Lake Tawakoni, and Lake Fork. Services included condition assessment, prioritization of needs, cost analyses of replacement or repair, and development of a business risk exposure value for each element of the water supply system evaluated. An asset management inventory with a risk-based scoring system was developed to determine the near term and future prioritization and phasing of improvements to the raw water facilities.

Supplemental Agreement No. 1 provided specialized investigations and evaluations identified during the initial phase and detailed engineering designs for critical raw water facility improvements. The critical raw water facilities included Lake Ray Hubbard Intake, Forney Pump Station, and Forney D...

Click here for full text