PILLAR: Fiscally Sound
AGENDA DATE: December 9, 2026
COUNCIL DISTRICT(S): Citywide
DEPARTMENT: Office of Procurement Services
PRIORITY: Infrastructure
______________________________________________________________________
SUBJECT
Title
Authorize a three-year service price agreement for cathodic protection system surveys and inspections for the Dallas Water Utilities Department – Lockwood, Andrews & Newnam, Inc, most advantageous proposer of six – Estimated amount of $319,725.00 – Financing: Dallas Water Utilities Fund (subject to annual appropriations)
*In alignment with Infrastructure Maintenance.
Body
BACKGROUND
This action does not authorize or encumber funding. The service price agreement establishes pre-negotiated pricing and contract terms for a specified period of time. Actual expenditures will occur only when services are requested and are supported by available departmental appropriations. The estimated amount represents the maximum anticipated value based on all potential usage scenarios during the contract term and is provided for planning purposes only. Actual expenditures may vary significantly and will be driven by operational needs. For reference, the City's average annual expenditure for these services over the past three years has been approximately $58,000.00 per year.
This service price agreement will provide for cathodic protection system surveys and inspections for the Dallas Water Utilities Department (DWU). Cathodic protection systems protect a wide range of metallic and reinforced concrete pipelines in various environments. The corrosion protection system extends the life of the existing infrastructure by protecting the internal and external steel components of water pipelines from corrosion.
DWU currently has approximately 29 miles of large diameter water mains protected by cathodic protection systems. This agreement will provide National Association of Corrosion Engineers certified inspections and testing of corrosion protectio...
Click here for full text