File #: 23-1221    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/24/2023 In control: Water Utilities Department
On agenda: 6/28/2023 Final action:
Title: Authorize a professional services contract with CP&Y, Inc. dba STV Infrastructure to provide engineering services for the Cedardale High Pressure Zone Improvements Project - Not to exceed $2,099,674.00 - Financing: Water Capital Improvement F Fund
Indexes: 8
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 28, 2023

COUNCIL DISTRICT(S):                     8

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with CP&Y, Inc. dba STV Infrastructure to provide engineering services for the Cedardale High Pressure Zone Improvements Project - Not to exceed $2,099,674.00 - Financing: Water Capital Improvement F Fund

 

Body

BACKGROUND

 

In September 2022, the Dallas Water Utilities completed an analysis of the Cedardale High Pressure Plane. A Technical Memorandum recommended pipeline and elevated tank improvements for the Cedardale High Pressure Zone. The Technical Memorandum identified the following issues:

 

                     The existing Cedardale storage tank cannot be cycled as desired due to the low tank height. 

                     The Cedardale High pressure plane experiences low pressures in areas with high elevations.

                     During an emergency when the Alta Mesa Pump Station is out of service, the pressures in some parts of the Cedardale High Pressure Plane drop significantly below the minimum Texas Commission on Environmental Quality criteria of 35 psi, even when boundary valves are opened between Cedardale High and adjacent pressure zones.

 

This action will authorize an engineering contract to further evaluate and design needed improvements to the Cedardale High Pressure Zone. The engineer will provide preliminary design reports, final design plans, specifications, and bid services for pipeline improvements, elevated tank improvements, and other pressure zone modifications. Future supplemental agreements are anticipated for construction phase services depending on how the improvements are phased and packaged. CP&Y, Inc. dba STV Infrastructure’s approach to design and construction for this project involves separating the improvements into two construction packages, one for pipeline and associated valve improvements and another for elevated tank and related facilities improvements and pressure zone modifications.

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                          July 2023

Complete Design                     November 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Water Capital Improvement F Fund

$2,099,674.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$2,099,674.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.01%

34.01%

$714,000.00

This contract exceeds the M/WBE goal.

CP & Y, Inc dba STV Infrastructure - Local; Workforce - 16.10% Local

 

OWNER

 

CP&Y, Inc. dba STV Infrastructure

 

Marisa Trevino Vergara, PE, Senior Vice President

 

MAPS

 

Attached