File #: 23-1252    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/27/2023 In control: Water Utilities Department
On agenda: 6/28/2023 Final action:
Title: Authorize (1) reprogramming of the 2017 General Obligation Bond Funds originally allocated for the Vinemont Channel Drainage Diversion Project to the Dixon Branch Drainage Relief Project and Eustis Avenue Drainage Evaluation; and (2) Supplemental Agreement No. 1 to the professional services contract with Halff Associates, Inc. to provide additional engineering work required for developing conceptual drainage relief plans for Dixon Branch and Eustis Avenue - Not to exceed $1,063,612.00, from $585,288.00 to $1,648,900.00 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds)
Indexes: 9
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 28, 2023

COUNCIL DISTRICT(S):                     9

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) reprogramming of the 2017 General Obligation Bond Funds originally allocated for the Vinemont Channel Drainage Diversion Project to the Dixon Branch Drainage Relief Project and Eustis Avenue Drainage Evaluation; and (2) Supplemental Agreement No. 1 to the professional services contract with Halff Associates, Inc. to provide additional engineering work required for developing conceptual drainage relief plans for Dixon Branch and Eustis Avenue - Not to exceed $1,063,612.00, from $585,288.00 to $1,648,900.00 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds)

 

Body

BACKGROUND

 

On June 26, 2019, the City Council authorized a professional services contract with Halff Associates, Inc. to analyze the viability of the Vinemont Channel Drainage Diversion Project and to provide necessary engineering services required for developing construction improvement plans. During the evaluation phase, it was determined that a standalone Vinemont Diversion would provide no meaningful flood reduction as the flooding is caused by Dixon Branch overflow. Dallas Water Utilities (DWU) staff then evaluated different options to best utilize the remaining funds for the Vinemont project. After several meetings with the neighborhood association and council office, DWU recommended to update the engineering scope of services and reallocate funds to advance the larger Dixon Branch Drainage Relief Project and evaluate drainage improvements for the 8600-8800 blocks of Eustis Avenue to provide flood reduction benefits.

 

This action will authorize Halff Associates, Inc. to provide additional engineering services necessary to analyze drainage relief improvements for Dixon Branch from Lake Highlands Drive to upstream of White Rock Lake and Eustis Avenue from Lakeland Drive to Tavaros Avenue. The services will include survey, geotechnical borings, environmental review/screening, modeling, alternative analysis, a drainage report, funding source evaluation, agency coordination and public meeting assistance, and conceptual design for Dixon Branch to achieve a 15% level of design. For Eustis Avenue, services will include survey, modeling, alternative analysis, and a drainage report to achieve a 10% level of design. Following the completion of these services, a future supplemental agreement may be pursued to utilize the remaining bond funds from the original Vinemont Channel Drainage Diversion Project to further advance design efforts and improvement plans for Dixon Branch and Eustis Avenue.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Engineering Services         July 2023

Complete Engineering Services   November 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On June 26, 2019, the City Council authorized a professional services contract with Halff Associates, Inc. for the engineering design of the Vinemont Channel Drainage Diversion Project by Resolution No. 19-1034.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Flood Control (D) Fund (2017 General Obligation Bond Funds)

$1,063,612.00

$0.00

$0.00

 

Design                     $   585,288.00

Supplemental Agreement No. 1 (this action)                     $1,063,612.00

 

Project Total                     $1,648,900.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$1,063,612.00

Architecture & Engineering

25.66%*

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

25.66%

25.66%

$272,930.00

* This item reflects previous Business Inclusion and Development MWBE Policy

This contract meets the M/WBE goal.

Supplemental Agreement # 1 - 25.80% Overall MWBE Participation

Halff Associates, Inc - Local; Workforce - 22.80% Local

 

 

 

 

 

OWNER

 

Halff Associates, Inc.

 

Mark Edwards, President

 

MAPS

 

Attached