File #: 26-347A    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 1/15/2026 In control: Park & Recreation Department
On agenda: 2/11/2026 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with IEA, Inc. to provide engineering design and consulting services for an additional hydraulic and hydrology study to meet Federal Emergency Management Agency requirement for the Dixon Branch Greenbelt Pedestrian Bridge Project located at 10305 Lippitt Avenue, design of Herndon Park Bridge located at 400 East Woodin Boulevard, including surveying, geotechnical exploration and report, hydraulic and hydrology study, and design the repair of the retaining wall at Flagpole Hill Trail located near 6800 block of Northwest Highway - Not to exceed $250,960.00, from $98,430.00 to $349,390.00 - Financing: Park and Recreation Facilities Fund (2006 General Obligation Bond Fund) ($31,580.00) and Park and Recreation Facilities (B) Fund (2024 General Obligation Bond Fund) ($219,380.00)
Indexes: 10, 4, 9
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Vibrant

AGENDA DATE:                     February 11, 2026

COUNCIL DISTRICT(S):                     4, 9, 10

DEPARTMENT:                     Park & Recreation Department

PRIORITY:                     N/A

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 1 to the professional services contract with IEA, Inc. to provide engineering design and consulting services for an additional hydraulic and hydrology study to meet Federal Emergency Management Agency requirement for the Dixon Branch Greenbelt Pedestrian Bridge Project located at 10305 Lippitt Avenue, design of Herndon Park Bridge located at 400 East Woodin Boulevard, including surveying, geotechnical exploration and report, hydraulic and hydrology study, and design the repair of the retaining wall at Flagpole Hill Trail located near 6800 block of Northwest Highway - Not to exceed $250,960.00, from $98,430.00 to $349,390.00 - Financing: Park and Recreation Facilities Fund (2006 General Obligation Bond Fund) ($31,580.00) and Park and Recreation Facilities (B) Fund (2024 General Obligation Bond Fund) ($219,380.00)

 

Body

BACKGROUND

 

Due to severe erosion at the south abutment of the existing bridge, the bridge had to close with immediate effect for public safety. A new pedestrian bridge was proposed to provide access to the park and the playground.

 

On September 26, 2023, a Request for Proposal was issued to provide engineering and design services for the Dixon Branch Greenbelt Pedestrian Bridge.

 

On October 21, 2024, Administrative Action No. 24-6241 authorized a professional services contract with IEA, Inc. for surveying, schematic design, design development, basic hydraulics and hydrology studies, for the Dixon Branch Greenbelt Pedestrian Bridge Project located at 10305 Lippitt Avenue.

 

This item includes the design for the repair of an existing bridge through a reprogramming of Council District 9 bond funds (Dixon Branch), the design of a new bridge that is in the 2024 Bond Program (Herndon Park) and the repair of a retaining wall (Flagpole Hill).

 

This action will authorize Supplemental Agreement No. 1 to the professional services contract with IEA, Inc. to provide engineering design and consulting services for the Dixon Branch Greenbelt Pedestrian Bridge, Herndon Bridge and design the repair of the retaining wall at Flagpole Hill Trail, in an amount not to exceed $250,960.00 increasing the original contract amount from $98,430.00 to $349,390.00.

 

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          September 2024

Complete Design                                          May 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On February 5, 2026, the Park and Recreation Board authorized Supplemental Agreement No. 1 to the professional services contract with IEA, Inc. to provide engineering design and consulting services for an additional hydraulic and hydrology study to meet Federal Emergency Management Agency requirement for the Dixon Branch Greenbelt Pedestrian Bridge Project located at 10305 Lippitt Avenue, design of Herndon Park Bridge located at 400 East Woodin Boulevard, including surveying, geotechnical exploration and report, hydraulic and hydrology study, and design the repair of the retaining wall at Flagpole Hill Trail located near 6800 block of Northwest Highway.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Park and Recreation Facilities Fund (2006 General Obligation Bond Fund)

$  31,580.00

$0.00

$0.00

Park and Recreation Facilities (B) Fund (2024 General Obligation Bond Fund)

$219,380.00

$0.00

$0.00

Total

$250,960.00

$0.00

$0.00

 

Original Contract                     $  98,430.00

Supplemental Agreement No. 1 (this action)                     $250,960.00

 

Total                      $349,390.00

 

Council District                        Amount

 

4                     $148,135.00

9                     $  71,245.00

10                      $  31,580.00

 

Total                      $250,960.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

IEA, Inc.

Local

10.96%

 

OWNER/EXECUTIVE

 

IEA, Inc.

6505 Mapleshade Road

Dallas, TX, 75252

 

Tom Morris, P. E.

 

MAP

 

Attached