Legislation Details

File #: 24-1980    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 6/10/2024 In control: Department of Public Works
On agenda: 8/14/2024 Final action:
Title: Authorize Supplemental Agreement No. 2 to the professional services contract with VRX, Inc. for the design of additional paving, drainage, water and wastewater main improvements for the West Red Bird Lane Bridge over Woody Branch Creek Project - Not to exceed $207,085.00, from $335,166.68 to $542,251.68 - Financing: 2023 Certificate of Obligation ($183,470.00), Water Capital Improvement G Fund ($17,711.25), and Wastewater Capital Improvement F Fund ($5,903.75)
Indexes: 3, 4
Attachments: 1. List, 2. Map, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     August 14, 2024

COUNCIL DISTRICT(S):                     3, 4

DEPARTMENT:                     Department of Public Works

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 2 to the professional services contract with VRX, Inc. for the design of additional paving, drainage, water and wastewater main improvements for the West Red Bird Lane Bridge over Woody Branch Creek Project - Not to exceed $207,085.00, from $335,166.68 to $542,251.68 - Financing: 2023 Certificate of Obligation ($183,470.00), Water Capital Improvement G Fund ($17,711.25), and Wastewater Capital Improvement F Fund ($5,903.75)

 

Body

BACKGROUND

 

On December 12, 2018, the City Council authorized a professional services contract with VRX, Inc. for the engineering design of the bridge reconstruction for the West Red Bird Lane Bridge over Woody Branch Creek Project by Resolution No. 18-1768.

 

VRX, Inc. is located in Plano, Texas; and is a registered vendor with the City of Dallas.

 

This project will replace the existing bridge and raise the new bridge to provide two-feet of freeboard above the 100-year flood water surface elevation as well as raise and reconstruct the adjacent roadway including paving, sidewalk, curb and gutter, and drainage improvements. The project will also perform a hydraulic study based on the proposed bridge crossing and upgrade the existing water and wastewater mains.

 

During the design it was determined that the limits of roadway reconstruction needed to be extended due to the proposed bridge layout which requires channel modifications and extending the limits of the bridge approaches. The limits of the drainage and utility improvements will also be extended to match the proposed pavement limits. Therefore, additional services are needed to design the additional paving, drainage, water and wastewater main improvements.

 

This action will authorize Supplemental Agreement No. 2 to the professional  services contract with VRX, Inc. for the design of additional paving, drainage, water and wastewater main improvements for the West Red Bird Lane over Woody Branch Creek project.

 

If this action is delayed or deferred, it would delay the replacement of the West Red Bird Lane Bridge over Woody Branch Creek and delay the implementation of the 2017 Bond Program.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          January 2019

Complete Design                                          April 2025

Begin Construction                                          October 2025

Complete Construction                     March 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On December 12, 2018, the City Council authorized a professional services contract with VRX, Inc. for the engineering design of the bridge reconstruction for the West Red Bird Lane Bridge over Woody Branch Creek project by Resolution No. 18-1768.

 

On December 11, 2019, the City Council authorized Supplemental Agreement No. 1 to the professional services contract with VRX, Inc. for additional engineering design of water and wastewater mains as part of the West Red Bird Lane over Woody Branch project by Resolution No. 19-1882.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

2023 Certificate of Obligation

$ 183,470.00

$0.00

$0.00

Water Capital Improvement G Fund

$   17,711.25

$0.00

$0.00

Wastewater Capital Improvement F Fund

$     5,903.75

$0.00

$0.00

Total

$ 207,085.00

$0.00

$000

 

Design                                                                                                                              $256,636.68

Supplemental Agreement No. 1                                                               $  78,530.00

Supplemental Agreement No. 2 (this action)                     $207,085.00

 

Total Project Cost                                                                                                         $542,251.68

 

Council District                                             Amount

 

            3                                                               $103,542.50                     

            4                                                               $103,542.50                     

 

       Total                                                               $207,085.00

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$207,085.00

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

37.14%

98.36%

$203,685.00

• This contract exceeds the M/WBE goal.

• Supplemental Agreement No. 2 - 96.22% MWBE Overall participation

• VRX, Inc. - Non-local; Workforce - 12.00% Local

 

OWNER

 

VRX, Inc.

2500 North Dallas Parkway, Suite 450

Plano, TX 75093

 

Nawal (Noelle) Ibrahim, P.E., President

 

MAP

 

Attached