Skip to main content
Dallas Logo
File #: 25-2443A    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/30/2025 In control: Dallas Water Utilities Department
On agenda: 9/24/2025 Final action:
Title: Authorize a professional services contract with IEA, Inc. to provide engineering services for the evaluation and design of erosion control improvements at three locations (list attached to the Agenda Information Sheet) - Not to exceed $216,671.00 - Financing: Flood Protection and Storm Drainage (C) Fund (2024 General Obligation Bond Fund) ($102,744.00) and Storm Drainage Management Certificate of Obligation Series 2024B Capital Fund ($113,927.00)
Indexes: 11, 12, 8
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Sustainable

AGENDA DATE:                     September 24, 2025

COUNCIL DISTRICT(S):                     8, 11, 12

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with IEA, Inc. to provide engineering services for the evaluation and design of erosion control improvements at three locations (list attached to the Agenda Information Sheet) - Not to exceed $216,671.00 - Financing: Flood Protection and Storm Drainage (C) Fund (2024 General Obligation Bond Fund) ($102,744.00) and Storm Drainage Management Certificate of Obligation Series 2024B Capital Fund ($113,927.00)

 

Body

BACKGROUND

 

The City of Dallas has identified various properties experiencing severe erosion which have been included in the 2024 Bond Program. Engineering services are needed to evaluate options and develop construction documents to stabilize eroded stream banks utilizing gabion walls or other approved erosion control measures. The improvements will stabilize the existing stream banks while staying within the existing property boundary and floodway or erosion control easements.

 

This action will authorize a professional services contract with IEA, Inc. for the engineering evaluation and design of erosion control improvements at three locations. Erosion control improvements will be evaluated and designed for 835 Wixom Lane, 13059 Hillcrest Road, and 17911 Davenport Road. The services provided for this contract include project management, topographic and boundary surveys, easement document preparation, environmental permitting, subsurface utility exploration, geotechnical investigations, structural analysis, hydraulic analysis, and development of conceptual and final construction plans and special specifications.

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                                          October 2025

Complete Services                                          October 2028

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Flood Protection and Storm Drainage (C)  Fund (2024 General Obligation Bond Fund)

$102,744.00

$0.00

$0.00

Storm Drainage Management Certificate of Obligation Series 2024B Capital Fund

$113,927.00

$0.00

$0.00

Total

$216,671.00

$0.00

$0.00

 

    Council District                                             Amount

 

                     8                                                               $  46,070.00

11                                                               $102,156.00

                     12                                                               $  68,445.00

 

        Total                                                               $216,671.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

IEA, Inc.

Local

10.96%

 

OWNER/EXECUTIVE

 

IEA, Inc.

 

Shakeel Ahmed, P.E., President

 

MAPS

 

Attached