File #: 25-1591A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 4/30/2025 In control: Department of Aviation
On agenda: 6/25/2025 Final action:
Title: Authorize a construction services contract to renovate the 3rd floor of the Law Enforcement Building with three office spaces, two conference rooms, eight security workstation, 10 Airport Communications Center workstations, seven Airport Emergency Operation Center workstations, one sleeping lounge, one breakroom and one kitchen located at the Airport Communications Center (formerly the Airport Operations Center)/ Airport Emergency Operation Center at Dallas Love Field - Post L Group, LLC, lowest responsible bidder of four - Not to exceed $2,614,155.00 - Financing: Aviation Construction Fund
Indexes: 6
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Sustainable

AGENDA DATE:                     June 25, 2025

COUNCIL DISTRICT(S):                     6

DEPARTMENT:                     Department of Aviation

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract to renovate the 3rd floor of the Law Enforcement Building with three office spaces, two conference rooms, eight security workstation, 10 Airport Communications Center workstations, seven Airport Emergency Operation Center workstations, one sleeping lounge, one breakroom and one kitchen located at the Airport Communications Center (formerly the Airport Operations Center)/ Airport Emergency Operation Center at Dallas Love Field - Post L Group, LLC, lowest responsible bidder of four - Not to exceed $2,614,155.00 - Financing: Aviation Construction Fund

 

Body

BACKGROUND

 

Dallas Love Field’s Law Enforcement Building was completed and occupied in 2018. It is a 3-story concrete and steel building with floor plates of approximately 3,000 square feet per floor. The Dallas Police Department's Love Field Unit occupies the 1st and 2nd floors, and Airport Operations occupies the 3rd floor. This project will remodel the existing 3rd floor to meet the Airport Communications Center (ACC) (formerly the Airport Operations Center)/Airport Emergency Operation Center (AEOC) operation needs.

 

The Airport Operations Center (AOC) has been rebranded and is now the Airport Communications Center (ACC) which now operates for the purposes of this contract in the same fashion.

 

The ACC is an integral part of daily airport operations which requires a standard of functional requirements for 24/7 operational support during normal conditions, irregular operation, and emergency situations. The AEOC is an essential component of emergency response and recovery where key officials can collect, communicate, and coordinate information and resources. The current layout, equipment, and resources are not sufficient in enabling the ACC/AEOC core functions above. A redesign of each center is proposed to allow for optimal operations in support of daily and emergent events.

 

 

 

 

The project intent for co-location of these two critical functions is the ability to collect, analyze and share information between ACC/AEOC quickly and face-to-face during emergency management.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                     August 2023

Completed Design                     January 2025

Begin Construction                     July 2025

Complete Construction                     July 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On June 28, 2023, the City Council authorized an architectural services contract with McAfee3 Architecture, Inc., to provide design services for the Airport Emergency Operation Center/Airport Operation Center and bid phase services at Dallas Love Field by Resolution No. 23-0874.

 

On May 14, 2025, the City Council authorized Supplemental Agreement No. 1 to the architectural services contract with McAfee3 Architecture, inc., to amend the scope of work to include construction administration services for the Airport Operation Center/Airport Emergency Operation Center at Dallas Love Field by Resolution No. 25-0714.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Aviation Construction Fund

$2,614,155.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$2,614,155.00

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

21.50%

75.18%

$1,965,288.00

This contract does not meet the M/WBE goal, but complies with good faith efforts.

Post L Group, LLC - Local; Workforce - 30.65% Local

 

 

 

 

BID INFORMATION

 

The following four bids were received and opened on March 28, 2025:

 

*Denotes successful bidder

 

Bidders                                                                                                                              Amount

 

*Post L Group, LLC                                          $2,614,155.00

530 East Pleasant Run Road

Suite 110

Desoto, Texas 75115

BOWA Construction                                                                                     $2,699,619.81

SDB, Inc.                                                                                                                              $3,214,726.47

Real Construction Group                                                                                    $4,247,543.00

 

OWNER

 

Post L Group, LLC

 

Jeff Postell, Jr., President and Chief Executive Officer

 

MAP

 

Attached