Legislation Details

File #: 24-1281    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/9/2024 In control: Park & Recreation Department
On agenda: 8/14/2024 Final action:
Title: Authorize a construction services contract for the construction of the Anita Na?ez Martinez Recreation Center Building Envelope Renovation Project located at 3212 North Winnetka Avenue - York Builders, Inc, best value proposer of five - Not to exceed $1,160,269.20 - Financing: Park and Recreation (B) Fund (2017 General Obligation Bond Fund) ($141,554.54) and Capital Construction Fund ($1,018,714.66)
Indexes: 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Quality of Life, Arts & Culture

AGENDA DATE:                     August 14, 2024

COUNCIL DISTRICT(S):                     6

DEPARTMENT:                     Park & Recreation Department

EXECUTIVE:                     John D. Jenkins

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for the construction of the Anita Nañez Martinez Recreation Center Building Envelope Renovation Project located at 3212 North Winnetka Avenue - York Builders, Inc, best value proposer of five - Not to exceed $1,160,269.20 - Financing: Park and Recreation (B) Fund (2017 General Obligation Bond Fund) ($141,554.54) and Capital Construction Fund ($1,018,714.66)

 

Body

BACKGROUND

 

On October 20, 2023, the City of Dallas advertised a re-bid of Request for Competitive Sealed Proposals (RFCSP) for the construction of the Anita Nañez Martinez Recreation Center Building Envelope Renovation Project with bids due November 9, 2023.  The re-bid effort was desired as the initial bid for this project on September 8, 2023 resulted in several non-responsive bids.  A pre-proposal conference was held on October 25, 2023, with two potential proposer(s) in attendance.

 

In response to the advertisement, the Office of Procurement Services received submittals from five firms on November 9, 2023.  The bid procurement process complied with the City’s Administrative Directive 4-05: Contracting Policy, Section 10 Procurement Processes.

 

This action will authorize a construction services contract for the Anita Nañez Martinez Recreation Center Building Envelope Renovation Project located at 3212 North Winnetka Avenue to York Builders, Inc, the best value proposer of five, in an amount not to exceed $1,160,269.20.  The scope of work includes total replacement of existing damaged exterior façade gypsum fiber reinforced concrete decorative panel bands with cast stone panels on three facades, repairs of several existing steel framed windows, repairs of cracks on the exterior plaster finish on gymnasium exterior walls, repairs on the gymnasium athletic wood floor, painting of the gymnasium interior, and preparing and painting interior drywall surfaces adjacent to exterior windows scheduled for repairs, and exterior cement plaster repairs to the gymnasium.

 

 

Proposals based on the RFCSP procurement process are evaluated on pre-set criteria which include qualifications of the prime contractor, subcontractor experience, cost, construction amount and schedule ratings, which are based on mathematical formulas, with the best price and best schedule being given the highest scores. Ratings “0” to “10” are given for each criterion with “10” being the best rating. These ratings are multiplied by the weighting to obtain the score for each criterion.

 

Following is a list of the rating criteria and values for each criterion:

 

Rating Criteria                     Value

 

1. Proposed Construction Contract Amount                     45%

2. Qualifications/Experience/References for Prime Firm                     20%

3. Subcontractor Experience                     10%

4. Business Inclusion and Development Plan                     15%

5. Financial Sufficiency                       5%

6. Proposed Schedule/Time of Completion                       5%

 

                     100%

 

The selection committee selected York Builders, Inc. as the best value proposer based on the rating criteria.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                           October 2019

Design Completed                                          July 2020

Began Construction                                          September 2024

Complete Construction                     March 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On April 4, 2024, the Park Board authorized a construction services contract for the construction of the Anita Nañez Martinez Recreation Center Building Envelope Renovation Project located at 3212 North Winnetka Avenue with York Builders, Inc, best value proposer of five.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Park and Recreation (B) Fund (2017 General Obligation Bond Fund)

$  141,554.54

$0.00

$0.00

Capital Construction Fund

$1,018,714.66

$0.00

$0.00

Total

$1,160,269.20

$0.00

$0.00

 

 

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$1,160,269.20

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

40.54%

68.80%

$798,265.21

• This contract exceeds the M/WBE goal.

• York Builders, Inc - Non-local; Workforce - 35.00% Local

 

PROCUREMENT INFORMATION

 

The following proposals were received from solicitation number CIZ23-PKR-3054, opened on November 9, 2023:

 

*Denotes successful proposer

 

                     Alt. Nos. 1

Proposers                                   Base Bid      3 and 4**              Total Bid                           Rankings**

 

*York Builders, Inc                                    $  972,783.00                     $187,486.20                     $1,160,269.20                     1

 1301 East Debbie Lane

 Suite 102 523

 Mansfield, TX  76063

Big Sky Construction Co.                       $1,195,000.00                     $181,000.00                     $1,376,000.00                     2

Joel Brown & Co.                                    $1,139,597.00                     $238,000.00                     $1,377,597.00                     3

Prestige Building Group, LLC                       $1,522,314.18                     $295,288.07                     $1,817,602.25                     4

Dorothy Design Studio.                                                                                                 **Non-responsive

 

*Alternate No. 1 - Provides for repairs to the plaster for gymnasium & columns at South covered porch.

*Alternate No. 3 - Provides for the preparation & paint interior drywall adjacent to repaired exterior windows.

*Alternate No. 4 - Provides for repairs to the gymnasium athletic floor & miscellaneous exit door & paint gym interior walls & spot paint ceiling.

 

**Dorothy Design Studio was deemed non-responsive due to an incomplete proposal.

 

 

 

 

 

 

OWNER

 

York Builders, Inc

 

Reginald York, President/Principal-In Charge

 

MAP

 

Attached