Dallas Logo
File #: 23-2077    Version: 1 Name:
Type: ITEMS FOR INDIVIDUAL CONSIDERATION Status: Approved
File created: 8/7/2023 In control: Department of Aviation
On agenda: 9/27/2023 Final action:
Title: Authorize (1) an increase in appropriations in an amount not to exceed $29,115,539.00 in the Aviation Passenger Facility Charge - Near Term Projects Fund; (2) a reduction in appropriations in an amount not to exceed $16,405,836.00 in the Aviation Commercial Paper Fund; and (3) a construction services contract to provide construction services for the Runway 13L-31R Runway Safety Area Improvements and Rehabilitate Taxiway A Project at Dallas Love Field - Flatiron Constructors, Inc., only bidder - Not to exceed $60,973,000.00 - Financing: Aviation Passenger Facility Charge - Near Term Projects Fund ($28,894,625.00) and FAA FY23 Grant Fund ($32,078,375.00)
Indexes: 2
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     September 27, 2023

COUNCIL DISTRICT(S):                     2

DEPARTMENT:                     Department of Aviation

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) an increase in appropriations in an amount not to exceed $29,115,539.00 in the Aviation Passenger Facility Charge - Near Term Projects Fund; (2) a reduction in appropriations in an amount not to exceed $16,405,836.00 in the Aviation Commercial Paper Fund; and (3) a construction services contract to provide construction services for the Runway 13L-31R Runway Safety Area Improvements and Rehabilitate Taxiway A Project at Dallas Love Field - Flatiron Constructors, Inc., only bidder - Not to exceed $60,973,000.00 - Financing: Aviation Passenger Facility Charge - Near Term Projects Fund ($28,894,625.00) and FAA FY23 Grant Fund ($32,078,375.00)

 

Body

BACKGROUND

 

Dallas Love Field has developed a Five-Year Airside Capital Improvement Program. This program is based on the results of the Love Field Pavement Evaluation Study performed in 2017 and on the requirements of the Federal Aviation Administration (FAA), which showed that all existing taxiways and connectors located on the west side of the terminal are reaching the end of their useful life. In addition, it is necessary to reconfigure and reconstruct the taxiways and connectors to conform to current FAA safety standards.

 

Garver, LLC provided design documents and will be providing construction administration services for the Runway 13L-31R Runway Safety Area (RSA) Improvements and Rehabilitate Taxiway A Project at Dallas Love Field. During the design, the Department of Aviation coordinated an agreement with the FAA to provide financial grants to be used to assist in the necessary improvements of the Runway 13L-31R RSA Improvements and Rehabilitate Taxiway A Project.

 

This action will authorize a construction services contract with Flatiron Constructors, Inc. to provide construction services for the Runway 13L-31R RSA Improvements and Rehabilitate Taxiway A Project at Dallas Love Field. This project will correct RSA deficiencies with full RSA grading and installation of new drainage infrastructure along the Taxiway A side of the runway and rehabilitate the existing Taxiway A pavement between existing Taxiway A south and Taxiway A5. The project will replace pavement that has exceeded its useful life and requires replacement and will address safety-related improvements within the Runway 13L-31R safety area and at an existing hot spot at the north end of Taxiway A.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                     October 2022

Completed Design                                          April 2023

Begin Construction                                          January 2024

Complete Construction                                          April 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On September 14, 2022, the City Council authorized an engineering services contract with Garver, LLC to provide design, planning, engineering, construction document and construction administration services for the design of the Taxiway A Project at Dallas Love Field by Resolution No. 22-1345.

 

On August 23, 2023, the City Council authorized acceptance of the U.S. Department of Transportation, Federal Aviation Administration Entitlement and Discretionary Grant Funds for the Runway 13L/31R Reconstruction Project at Dallas Love Field by Resolution No. 23-1128.

 

FISCAL INFORMATION

 

Fund

FY 2023-24

FY 2024-25

Future Years

Aviation Passenger Facility Charge - Near Term Projects Fund

$28,894,625.00

$0.00

$0.00

FAA AIP FY23 Grant Fund

$32,078,375.00

$0.00

$0.00

Total

$60,973,000.00

$0.00

$0.00

 

DBE INFORMATION

 

In accordance with US CFR 49, Part 26 for Disadvantaged Business Enterprise (DBE) participation on projects wholly or partly funded through federal grant dollars, the DBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

DBE Goal

$60,973,000.00

Construction

23.00%

DBE Subcontracting %

DBE Overall %

DBE Overall Participation $

26.07%

26.07%

$15,895,119.70

This contract exceeds the DBE goal.

Flatiron Constructors, Inc. - Non-local; Workforce - 0.00% Local

 

PROCUREMENT INFORMATION

 

The following bid was the sole bidder received and opened on June 23, 2023:

 

*Denotes only bidder

 

 

 

 

 

 

 

Bidder                                                                                                           Bid Amount

 

*Flatiron Constructors, Inc.                     $60,973,000.00

 2350 Airport Freeway, Suite 455

 Bedford, TX 76022

 

OWNER                     

 

Flatiron Constructors, Inc.

 

Kurt Knebel, Vice President and District Manager

 

MAP

 

Attached