Skip to main content
Dallas Logo
File #: 26-23A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/19/2025 In control: Department of Transportation and Public Works
On agenda: 1/14/2026 Final action:
Title: Authorize a professional engineering services contract with HDR Engineering, Inc. to provide traffic signal design services for the five intersections in Group 1: Belt Line Road at Lawson Road; Beckleymeade Avenue at Polk Street; Buford Drive at Camp Wisdom Road; Akard Street at Young Street; Elm Street at Griffin Street; and a Traffic Safety Study and other associated engineering tasks for Abrams Road Corridor from Richmond Avenue to Beacon Street - Not to exceed $991,727.00 - Financing: Street and Transportation (A) Fund (2024 General Obligation Bond Fund) ($544,548.00) and General Fund ($447,179.00) *In alignment with Vision Zero Plan.
Indexes: 14, 2, 3, 8, 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     January 14, 2026

COUNCIL DISTRICT(S):                     2, 3, 8, 9, 14

DEPARTMENT:                     Department of Transportation and Public Works

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional engineering services contract with HDR Engineering, Inc. to provide traffic signal design services for the five intersections in Group 1: Belt Line Road at Lawson Road; Beckleymeade Avenue at Polk Street; Buford Drive at Camp Wisdom Road; Akard Street at Young Street; Elm Street at Griffin Street; and a Traffic Safety Study and other associated engineering tasks for Abrams Road Corridor from Richmond Avenue to Beacon Street - Not to exceed $991,727.00 - Financing: Street and Transportation (A) Fund (2024 General Obligation Bond Fund) ($544,548.00) and General Fund ($447,179.00)

 

*In alignment with Vision Zero Plan.

 

Body

BACKGROUND

 

On October 9, 2024, the City of Dallas released Request for Qualifications “CIZ24-PBW-3124 Streets and Transportation Design Services for Special Projects” for professional engineering services for various transportation infrastructure projects including streets, alleys, sidewalks, trails, and special services for traffic signals, street lighting/pedestrian lighting, permanent traffic signs, bicycle lane design, traffic studies, data gathering, permanent paving markings, intersection improvements, and railroad quiet zones.

 

HDR Engineering, Inc. was selected as the most highly qualified proposer to provide traffic signal design services for the five intersections in Group 1 and a Traffic Safety Study  and other associated engineering tasks for the Abrams Road Corridor from Richmond Avenue to Beacon Street.

 

Intersections and Corridor                                                                                                                                                   Council District

 

Akard Street at Young Street                                                                                                                                                   2

Buford Drive at Camp Wisdom Road                                                                                                                              3, 8

Belt Line Road at Lawson Road                                                                                                                                                   8

Beckleymeade Avenue at Polk Street                                                                                                                              8

Elm Street at Griffin Street                                                                                                                                                                        14

Abrams Road (Richmond Avenue to South Beacon Street)                                                               9, 14

 

If approved, this action will authorize a professional engineering services contract with HDR Engineering, Inc. to support the warranted installation or upgrade of traffic signal infrastructure at five intersections and conduct a traffic safety analysis and other associated tasks to improve traffic safety and efficiency.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                                               March 2026

Complete Design                                          February 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Street and Transportation (A) Fund (2024 General Obligation Bond Fund)

$444,548.00

$100,00000

$0.00

General Funds - TRN Unit 5357

$347,179.00

$100,000.00

$0.00

Total

$791,727.00

$200,000.00

$0.00

 

Council District                                 Amount

 

           2                     $141,807.00

           3                     $  65,763.00

           8                     $392,193.00

9                     $    9,588.00

          14                              $382,376,00

 

        Total                     $991,727.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

HDR Engineering, Inc.

Local

100.00%

 

PROCUREMENT INFORMATION

 

In accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines, HDR Engineering, Inc. was selected as the most highly qualified proposer to provide traffic signal design and traffic safety study services for the five intersections in Group 1 and the Abrams Road Corridor.

 

OWNER/EXECUTIVE

 

HDR Engineering, Inc.

 

Lucas Bathurst, Area Manager

 

MAP

 

Attached