File #: 24-1429    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/24/2024 In control: Water Utilities Department
On agenda: 6/26/2024 Final action:
Title: Authorize a professional services contract with Halff Associates, Inc. to provide engineering services for storm drainage system improvements at three locations along Williamson Branch - Not to exceed $2,054,100.00 - Financing: 2024 Certificate of Obligation Fund
Indexes: 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 26, 2024

COUNCIL DISTRICT(S):                     9

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Halff Associates, Inc. to provide engineering services for storm drainage system improvements at three locations along Williamson Branch - Not to exceed $2,054,100.00 - Financing: 2024 Certificate of Obligation Fund

 

Body

BACKGROUND

 

This action will authorize a professional services contract with Halff Associates, Inc. for the engineering evaluation and design of storm drainage improvements at three locations. Dallas Water Utilities has identified these areas in the City of Dallas impacted by stream flooding caused by an inadequate storm-drain system at Lange Circle. Engineering evaluations and design improvements will be completed under this contract to (1) replace existing bridges at Norris Street, Alderson Street, and Saratoga Circle; (2) construct a storm-sewer diversion along Williamson Branch from Lange Circle to the SoPac Trail; and (3) construct an intake structure to convey water from Lange Circle to the storm-sewer diversion. The proposed improvements will address flooding issues attributed to existing inadequate storm drain infrastructure in the Williamson Branch drainage basin.

 

The services provided for this contract include project management, topographic and boundary surveys, easement document preparation, subsurface utility exploration, geotechnical investigations, structural analysis, hydrologic and hydraulic analysis, and development of conceptual and final construction plans and specifications.

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                     July 2024

Complete Design                     October 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

2024 Certificate of Obligation Fund

$2,054,100.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$2,054,100.00

Architecture & Engineering

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.00%

34.00%

$698,400.00

This contract exceeds the M/WBE goal.

Halff Associates, Inc. - Local; Workforce - 19.00% Local

 

OWNER

 

Halff Associates, Inc.

 

Mark Edwards, President

 

MAPS

 

Attached