File #: 25-2438A    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/29/2025 In control: Dallas Water Utilities Department
On agenda: 9/24/2025 Final action:
Title: Authorize a construction services contract for storm drainage improvements at eight locations (list attached to the Agenda Information Sheet) - Camino Construction, LP lowest responsible bidder of four - Not to exceed $19,629,797.00 - Financing: Water Construction Fund ($388,803.19), Water Capital Improvement G Fund ($148,341.81), Wastewater Capital Improvement G Fund ($72,119.93), Wastewater Construction Fund ($1,322,773.07), Flood Control (D) Fund ($1,691,447.37), Stormwater Drainage Management Capital Construction Fund ($10,090,160.00), Stormwater Drainage Management Certificates of Obligation Series 2024B Capital Fund ($4,958,257.63), and 2024B Certificates of Obligation Fund ($957,894.00)
Indexes: 11, 12, 13, 14, 8, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Sustainable

AGENDA DATE:                     September 24, 2025

COUNCIL DISTRICT(S):                     8, 9, 11, 12, 13, 14

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for storm drainage improvements at eight locations (list attached to the Agenda Information Sheet) - Camino Construction, LP lowest responsible bidder of four - Not to exceed $19,629,797.00 - Financing:  Water Construction Fund ($388,803.19), Water Capital Improvement G Fund ($148,341.81), Wastewater Capital Improvement G Fund ($72,119.93), Wastewater Construction Fund ($1,322,773.07), Flood Control (D) Fund ($1,691,447.37), Stormwater Drainage Management Capital Construction Fund ($10,090,160.00), Stormwater Drainage Management Certificates of Obligation Series 2024B Capital Fund ($4,958,257.63), and 2024B Certificates of Obligation Fund ($957,894.00)

 

Body

BACKGROUND

 

This action will authorize a construction services contract with Camino Construction, LP, for improvements to address localized flooding at eight locations. Storm drainage and flood management improvements will be completed for the following areas: Parrish Branch Culvert at Wheatland Road, Sanford Avenue (Little Forest Hills), Greenhollow/Sapling Way/Clear Springs, 16209 Meandering Way, 5910 Tree Shadow Trail, 3162 Royal Lane, State Thomas - Flora/Boll to Fairmount, and Turtle Creek at Bowen. The construction work will consist of installing storm sewer relief systems and replacing existing storm drainage pipes and structures to increase drainage capacity and reduce flooding.

 

In addition to storm drainage improvements, the contract will include paving improvements on Greenhollow Lane and Sapling Way due to overlapping project limits with the Department of Transportation and Public Works and water and wastewater main replacements in the vicinity of State Thomas - Flora/Boll to Fairmount, 3162 Royal Lane, 16209 Meandering Way, and the Sanford Avenue (Little Forest Hills) area. The water and wastewater main replacements will address substandard water and wastewater infrastructure in the same project areas as the storm drainage improvements. This includes the installation of approximately 3,589 feet of water and wastewater mains ranging in size from 8-inch to 15-inch in diameter. The installation of the proposed mains will improve the capacity of the water and wastewater systems and reduce maintenance costs.

 

The following chart illustrates Camino Construction, LP’s contractual activities with the City of Dallas for the past three years:

 

                                                                                                                                                   AVI                     DWU                     PKR                     TPW

 

Projects Completed                                                                                                            0                        0                        0                        5

Active Projects                                                                                                               0                        3                        0                        2

Change Orders                                                                                                                  0                         0                        0                        0

Projects Requiring Liquidated Damages                                             0                        0                        0                        0

Projects Completed by Bonding Company                        0                        0                         0                        0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          November 2025

Complete Construction                     September 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Water Construction Fund

$     388,803.19

$0.00

$0.00

Water Capital Improvement G Fund

$     148,341.81

$0.00

$0.00

Wastewater Capital Improvement G Fund

$       72,119.93

$0.00

$0.00

Wastewater Construction Fund

$  1,322,773.07

$0.00

$0.00

Flood Control (D) Fund

$  1,691,447.37

$0.00

$0.00

Stormwater Drainage Management Capital Construction Fund

$  7,090,160.00

$3,000,000.00

$0.00

Stormwater Drainage Management Certificate of Obligation Series 2024B Capital Fund

$  4,958,257.63

$0.00

$0.00

2024B Certificates of Obligation Fund

$     957,894.00

$0.00

$0.00

Total

$16,629,797.00

$3,000,000.00

$0.00

 

Council District                                                                   Amount

 

 8                                                                                     $   784,240.00

 9                                                                                     $5,848,630.00

11                                                                                    $5,086,346.00

12                                                                                     $4,486,145.00

13                                                                                    $1,043,468.00

14                                                                                     $2,380,968.00

 

       Total                                                                                     $19,629,797.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

Camino Construction, LP

Non-local

60.0%

 

PROCUREMENT INFORMATION

 

The following four bids with quotes were received on June 20, 2025:

 

*Denotes successful bidder

 

Bidders                                                                                                                                Bid Amount

 

*Camino Construction, LP                                                                                    $19,629,797.00

1208 Metro Park

Lewisville, TX 75057

SYB Construction                                                                                                         $19,979,295.31

Apple Pavement Services                                                                                    $21,714,034.40

Western Municipal                                                                                                         $23,996,912.20

 

OWNER/EXECUTIVE

 

Camino Construction, LP

 

Rogelio Ayala, President

 

 

MAPS

 

Attached