File #: 24-2968    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 9/11/2024 In control: Dallas Water Utilities Department
On agenda: 11/13/2024 Final action:
Title: Authorize a Construction Manager-at-Risk Agreement to provide pre-construction and construction services for the Elm Fork Water Treatment Plant Water Quality Improvements Program - Archer Western Construction, LLC, best value proposer of three - Not to exceed $4,087,120.00 - Financing: Water Capital Improvement G Fund ($4,000,000.00) and Water Capital Improvement F Fund ($87,120.00)
Indexes: 200
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     November 13, 2024

COUNCIL DISTRICT(S):                     Outside City Limits

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a Construction Manager-at-Risk Agreement to provide pre-construction and construction services for the Elm Fork Water Treatment Plant Water Quality Improvements Program - Archer Western Construction, LLC, best value proposer of three - Not to exceed $4,087,120.00 - Financing: Water Capital Improvement G Fund ($4,000,000.00) and Water Capital Improvement F Fund ($87,120.00)

 

Body

BACKGROUND

 

The Elm Fork Water Treatment Plant (EFWTP) located in Carrollton, Texas was originally constructed in the 1950s and is the second largest of three water treatment plants serving Dallas Water Utilities (DWU) customers. In 2006, DWU commissioned a Water Quality Study that included the evaluation of finished water quality at each of its three water treatment plants. The recommendations included the implementation of biologically active filtration at each plant. DWU has successfully executed the implementation of these improvements at the East Side and Bachman Water Treatment Plants and is working to implement improvements at the EFWTP. The next steps include construction of a new filter complex and sedimentation basins, yard piping and two elevated storage tanks, pre-sedimentation basins and plant influent improvements, electrical improvements, chemical improvements, and decommissioning of phased out facilities to convert treatment operations, improve finished water quality, address hydraulic limitations, and replace existing infrastructure at the end of its useful life.

 

DWU evaluated delivery methods for the EFWTP Water Quality Improvements (WQI) Program and determined a CMAR to be the best approach based on management of the overall schedule, allowing assets to be placed in service sooner, increased cash flow flexibility to meet fiscal constraints, increased cost certainty, better management and mitigation of project risks, and to reduce the potential for gaps between projects where completed assets would remain inactive. In April 2024, DWU issued a request for proposals for a CMAR to provide preconstruction and construction phase services for the EFWTP WQI Program. Three companies submitted proposals. Based on experience, qualifications, project approach and the cost proposal, DWU selected Archer Western Construction, LLC as the best value proposer.

 

As the CMAR, Archer Western Construction, LLC will execute the WQI in two phases: pre-construction services and construction services. During the pre-construction phase, the CMAR will provide project management and planning, work closely with the engineer and DWU to provide constructability reviews and recommendations, conduct biddability, risk reviews and value engineering, and prepare Guaranteed Maximum Price (GMP) proposals for each improvement component. DWU will work collaboratively with the CMAR and the engineer to refine proposed improvement components and develop GMP proposals.

 

DWU has budgeted for six GMP proposals over a period from 2025 thru 2031 to complete all improvement components. The anticipated construction cost for the WQI program is estimated at approximately $500 to $550 million and will be completed in 2033. All GMP proposals will be brought forward for individual consideration and approval by the City Council after extensive review by DWU and its engineer.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                         December 2024

Complete Services                         December 2033

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

The Transportation and Infrastructure Committee was briefed by memorandum regarding this matter on October 21, 2024. <https://cityofdallas.legistar.com/View.ashx?M=F&ID=13386080&GUID=6FE9C0F6-9298-4042-8BB4-DF69D5C799AB>

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Water Capital Improvement G Fund

$4,000,000.00

$0.00

$0.00

Water Capital Improvement F Fund

$     87,120.00

$0.00

$0.00

Total

$4,087,120.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

 

 

 

Contract Amount

Procurement Category

M/WBE Goal

$4,087,120.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.19%

34.19%

$1,397,350.00

This contract exceeds the M/WBE goal.

Archer Western Construction, LLC - Local; Workforce - 7.15% Local

 

PROCUREMENT INFORMATION

 

The following three proposals were received and opened on May 31, 2024:

 

*Denotes successful proposer

 

Proposers                                                                                                                                  Amount                                          Rank

 

*Archer Western Construction, LLC                                          $4,087,120.00                        1

 1411 Greenway Drive

 Irving, Texas 75038

McCarthy Building Companies, Inc.                                          $6,999,117.00                        2

Oscar Renda Contracting                                                                                    $5,826,434.00                        3                     

 

OWNER/EXECUTIVE

 

Archer Western Construction, LLC

 

Daniel P. Walsh, President

 