File #: 24-1659    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/13/2024 In control: Water Utilities Department
On agenda: 6/26/2024 Final action:
Title: Authorize a professional services contract with O'Brien Engineering, Inc. to provide engineering services for storm drainage and erosion control improvements at three locations (list attached to the Agenda Information Sheet) - Not to exceed $512,048.00 - Financing: 2024 Certificate of Obligation Fund
Indexes: 13, 3, 7
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 26, 2024

COUNCIL DISTRICT(S):                     3, 7, 13

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with O’Brien Engineering, Inc. to provide engineering services for storm drainage and erosion control improvements at three locations (list attached to the Agenda Information Sheet) - Not to exceed $512,048.00 - Financing: 2024 Certificate of Obligation Fund

 

Body

BACKGROUND

 

This action will authorize a professional services contract with O’Brien Engineering, Inc. for the evaluation and design of storm drainage and erosion control improvements at three locations. Dallas Water Utilities has identified various locations in the City of Dallas impacted by streambank erosion and flooding. Engineering evaluations and design improvements will be completed under this contract for streambank stabilization, erosion control and slope protection at 3106 Dorrington Circle and the University Hills Bridge at Ricketts Branch. In addition, engineering services will be provided to address flooding issues attributed to existing inadequate storm drainage infrastructure at the Mid Pines Drive and Sonnet Drive intersection, including storm drainage improvements from the intersection of Mid Pines Drive and Sonnet Drive to the intersection of Flair Drive and Cromwell Drive.

 

The services provided for this contract include project management, topographic and boundary surveys, easement document preparation, environmental permitting, subsurface utility exploration, geotechnical investigations, structural analysis, drainage studies including hydraulic analysis, and development of conceptual and final construction plans and special specifications.

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

 

 

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                          July 2024

Complete Design                     July 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

2024 Certificate of Obligation Fund

$512,048.00

$0.00

$0.00

 

Council District                                                                 Amount

 

           3                                                                                     $115,755.00

           7                                                                                     $  85,344.00

          13                                                                                     $310,949.00

 

Total                                                                                    $512,048.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$512,048.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.00%

34.00%

$174,096.00

This contract meets the M/WBE goal.

O’Brien Engineering, Inc. - Local; Workforce - 82.00% Local

 

OWNER

 

O’Brien Engineering, Inc.

 

Norman James (Jim) O’Brien, Owner

 

MAPS

 

Attached