File #: 24-1738    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/17/2024 In control: Department of Aviation
On agenda: 8/28/2024 Final action:
Title: Authorize (1) a construction services contract to provide construction to demolish the existing rooftop units, boilers, and air handling units and install ten new rooftop units, two new boilers, five new air handling units, and roof layer replacements to the Dallas Love Field Garage A & B Pedestrian Concourse Heating, Ventilation, and Air Conditioning/Boilers Replacement & Roof Repairs Project - RushCo Energy Specialists, Inc., lowest responsible bidder of two; and (2) an increase in appropriations in an amount not to exceed $1,897,602.12 in the Aviation Construction Fund - Not to exceed $7,199,214.61 - Financing: Aviation Construction Fund
Indexes: 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     August 28, 2024

COUNCIL DISTRICT(S):                     6

DEPARTMENT:                     Department of Aviation

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) a construction services contract to provide construction to demolish the existing rooftop units, boilers, and air handling units and install ten new rooftop units, two new boilers, five new air handling units, and roof layer replacements to the Dallas Love Field Garage A & B Pedestrian Concourse Heating, Ventilation, and Air Conditioning/Boilers Replacement & Roof Repairs Project - RushCo Energy Specialists, Inc., lowest responsible bidder of two; and (2) an increase in appropriations in an amount not to exceed $1,897,602.12 in the Aviation Construction Fund - Not to exceed $7,199,214.61 - Financing: Aviation Construction Fund

 

Body

BACKGROUND

 

The Dallas Love Field Garage A & B Pedestrian Concourse walkway was built in 2004 during the Love-Field Modernization Program.  Over the past few years, it has experienced water infiltration issues. The heating, ventilation, and air conditioning system installations on the roof also need to be evaluated for leaks and upgrades. O’Brien Engineering, Inc., engineers assessed the existing condition and provided recommendations on replacement and repairs.

 

RushCo Energy Specialists, Inc. will demolish the existing rooftop units, boilers, and air handling units and install ten new rooftop units, two new boilers, and five new air handling units.  Also, RushCo Energy Specialists, Inc. will be responsible for roof layer replacements.

 

This action will authorize a construction services contract with RushCo Energy Specialists Inc. for the Dallas Love Field Garage A & B Pedestrian Concourse Heating, Ventilation, and Air Conditioning/Boilers Replacement & Roof Repairs project at Dallas Love Field.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          June 2023

Completed Design                                          April 2024

Begin Construction                                          August 2024

Complete Construction                                          July 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On Mary 24, 2023, the City Council authorized an engineering services contract with O’Brien Engineering, Inc. to provide engineering services for the analysis of Garage A and B pedestrian concourse walkway roof and heating, ventilation, and air conditioning (HVAC) system as well as other HVAC system around the garage/terminal area, correct existing deficiencies, bid phase and construction administration services at Dallas Love Field by Resolution No. 23-0688.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Aviation Construction Fund

$7,199,214.61

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$7,199,214.61

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

29.18%

85.00%

$6,119,314.61

This contract does not meet the M/WBE subcontracting goal.

RushCo Energy Specialists, Inc. - Non-local; Workforce - 0.00% Local

 

PROCUREMENT INFORMATION

 

The following two bids were received and opened on May 3, 2024:

 

*Denotes successful bidder

 

Bidders                                                                                                                              Bid Amount

 

*RushCo Energy Specialists, Inc.                                          $  7,199,214.61

 10765 Tube Drive

 Hurst, Texas 76053

DMI Corp.                                                                                                                              $12,719,399.00

 

OWNER

 

RushCo Energy Specialists, Inc.

 

Anne Rusher, President

 

 

 

MAP

 

Attached