File #: 25-1190A    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/1/2025 In control: Dallas Water Utilities Department
On agenda: 6/11/2025 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Freese and Nichols, Inc. to provide additional engineering services required for storm drainage system and erosion control improvements at two locations (list attached to the Agenda Information Sheet) - Not to exceed $154,100.00, from $1,150,646.22 to $1,304,746.22 - Financing: Storm Drainage Management Capital Construction Fund ($139,100.00) and Water Capital Improvement G Fund ($15,000.00)
Indexes: 3, 7
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Sustainable

AGENDA DATE:                     June 11, 2025

COUNCIL DISTRICT(S):                     3, 7

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 1 to the professional services contract with Freese and Nichols, Inc. to provide additional engineering services required for storm drainage system and erosion control improvements at two locations (list attached to the Agenda Information Sheet) - Not to exceed $154,100.00, from $1,150,646.22 to $1,304,746.22 - Financing: Storm Drainage Management Capital Construction Fund ($139,100.00) and Water Capital Improvement G Fund ($15,000.00)

 

Body

BACKGROUND

 

On August 24, 2022, the City Council authorized a contract with Freese and Nichols, Inc. to provide engineering evaluation and design of storm drainage and erosion control improvements at four locations including improvements for the Red Bird Branch Culvert near Red Bird Lane and Polk Street, Ash Creek - South Fork Channel at John West Road, Botham Jean Boulevard (South Lamar) Phase 2 - Pear, Mooney, Bannock Area, and 2921 Leeshire Drive. During the analysis and design of these projects, additional engineering services were identified to resolve current flooding issues for the Ash Creek - South Fork Channel at John West Road location and to address conflicts between proposed stormwater drainage improvements and existing large diameter water and wastewater mains at the Red Bird Branch Culvert near Red Bird Lane location.

 

Freese and Nichols Inc. has submitted an acceptable proposal to complete these additional engineering services and the Dallas Water Utilities Department recommends that the contract with Freese and Nichols Inc. be modified to include these additional services. This action will authorize Supplemental Agreement No. 1 to the professional services contract with Freese and Nichols for additional engineering services, including topographical survey, subsurface utility investigations, easements, permitting, and design to package the proposed improvements for construction. 

 

 

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                         September 2022

Complete Design                    December 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On August 24, 2022, the City Council authorized a professional service contract with Freese and Nichols, Inc. to provide engineering services required for storm drainage system and erosion control improvements at four locations by Resolution No. 22-1229.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Storm Drainage Management Capital Construction Fund

$139,100.00

$0.00

$0.00

Water Capital Improvement G Fund

$  15,000.00

$0.00

$0.00

Total

$154,100.00

$0.00

$0.00

 

Original Contract                                                                                                         $1,150,646.22

Supplemental Agreement No. 1(this action)                     $   154,100.00

 

Total Project                                                                                                                              $1,304,746.22

 

Council District                                                               Amount

 

                     3                                                                                    $  15,000.00

                     7                                                                                    $139,100.00

 

Total                                                                                    $154,100.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$154,100.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.05%

34.05%

$52,464.00

This contract exceeds the M/WBE goal.

Freese and Nichols, Inc. - Local; Workforce - 39.29% Local

 

 

 

OWNER/EXECUTIVE

 

Freese and Nichols Inc.

 

Brian C. Coltharp, P.E., Chief Executive Officer

 

MAPS

 

Attached