File #: 24-942    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 3/13/2024 In control: Water Utilities Department
On agenda: 5/22/2024 Final action:
Title: Authorize two professional services contracts with two consulting firms, for the most highly qualified proposals to provide construction materials testing services during the installation of capital improvement projects at water treatment and distribution facilities - East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc., in an amount not to exceed $300,000, and Alliance Geotechnical Group, Inc., in an amount not to exceed $300,000.00 - Total not to exceed $600,000.00 - Financing: Water Capital Improvement G Fund ($375,000.00) and Water Construction Fund ($225,000.00)
Indexes: 10, 12, 200, 5, 7, 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     May 22, 2024

COUNCIL DISTRICT(S):                     5, 7, 9, 10, 12, Outside

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize two professional services contracts with two consulting firms, for the most highly qualified proposals to provide construction materials testing services during the installation of capital improvement projects at water treatment and distribution facilities - East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc., in an amount not to exceed $300,000, and Alliance Geotechnical Group, Inc., in an amount not to exceed $300,000.00 - Total not to exceed $600,000.00 - Financing: Water Capital Improvement G Fund ($375,000.00) and Water Construction Fund ($225,000.00)

 

Body

BACKGROUND

 

Dallas Water Utilities (DWU) provides water to approximately 2.6 million residents in the City of Dallas and neighboring communities. DWU operates three potable water treatment plants: Bachman, Elm Fork, and East Side. The combined treatment capacity of these facilities is 900 million gallons per day. DWU’s water delivery system consists of 22 pump stations, 21 storage tanks, 18 pressure planes, and over 5,000 miles of pipeline infrastructure. As part of DWU’s capital improvement program, infrastructure improvements projects are happening across the utility.

This action will authorize professional services contracts with two consulting firms, Alliance Geotechnical Group, Inc. and East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc. for construction materials testing services associated with capital improvement projects, including water treatment facilities, pump stations, and elevated water storage tanks.  Construction materials testing is required to ensure the installation meets project requirements and specifications. Testing services include soil and base material testing, in-place density and compaction testing, aggregate testing, concrete testing, asphaltic concrete testing, coring services, non-destructive testing, and other quality assurance related services as needed.

 

 

Alliance Geotechnical Group, Inc. and East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc. were selected as the most highly qualified proposers from a shortlist of two proposers, to perform construction materials testing services for these improvements based on submitted qualifications from a shortlist developed in accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines.  The contracts will cover a period of two years and provide necessary testing services for the capital improvement projects implemented by DWU.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Testing Services                                           May 2024

Complete Testing Services                                          May 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Water Capital Improvement G Fund

$375,000.00

$0.00

$0.00

Water Construction Fund

$225,000.00

$0.00

$0.00

Total

$600,000.00

$0.00

$0.00

 

     Council District                     Amount

 

                                  5                     $  60,000.00

                                  7                     $  60,000.00

                                  9                     $  60,000.00

                 10                     $  60,000.00

                 12                     $  60,000.00

                             Outside                     $300,000.00

                        

                               Total                     $600,000.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

 

 

 

 

 

 

Contract Amount

Procurement Category

M/WBE Goal

$600,000.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.50%

67.00%

$402,000.00

This contract exceeds the M/WBE subcontracting goal, one Prime is MBE. 

Alliance Geotechnical Group, Inc - Local; Workforce - 0.08% Local East Texas Testing Laboratory, Inc dba ETTL Engineers & Consultants Inc. - Non Local; Workforce - 45.00%

 

PROCUREMENT INFORMATION

 

In accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines, Alliance Geotechnical Group, Inc. and East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc. were selected as the most qualified consultant for this project.

 

OWNERS

 

Alliance Geotechnical Group, Inc.

 

Robert P. Nance, President

 

East Texas Testing Laboratory Inc. dba ETTL Engineers & Consultants Inc.

 

Chris Taylor, Vice President

 

MAP

 

Attached