Dallas Logo
File #: 23-672    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 2/23/2023 In control: Water Utilities Department
On agenda: 4/26/2023 Final action:
Title: Authorize a construction services contract for (1) a twelve-month master agreement for water and wastewater small services installations in the amount of $7,799,461.75; (2) the installation of water and wastewater mains at four locations in the amount of $2,533,711.00 (list attached to the Agenda Information Sheet); and (3) a twelve-month master agreement for water and wastewater main extensions and emergency main installations and relocations at various locations in the amount of $3,361,257.05 - Total not to exceed $13,694,429.80 - Omega Contracting, Inc., lowest responsible bidder of two - Financing: Wastewater Construction Fund ($4,983,909.10), Water Construction Fund ($4,601,864.40), Wastewater Capital Improvement F Fund ($3,588,308.90), and ECO (I) Fund (2017 General Obligation Bond Funds) ($520,347.40)
Indexes: 100
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     April 26, 2023

COUNCIL DISTRICT(S):                     All

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for (1) a twelve-month master agreement for water and wastewater small services installations in the amount of $7,799,461.75; (2) the installation of water and wastewater mains at four locations in the amount of $2,533,711.00 (list attached to the Agenda Information Sheet); and (3) a twelve-month master agreement for water and wastewater main extensions and emergency main installations and relocations at various locations in the amount of $3,361,257.05 - Total not to exceed $13,694,429.80 - Omega Contracting, Inc., lowest responsible bidder of two - Financing: Wastewater Construction Fund ($4,983,909.10), Water Construction Fund ($4,601,864.40), Wastewater Capital Improvement F Fund ($3,588,308.90), and ECO (I) Fund (2017 General Obligation Bond Funds) ($520,347.40)

 

Body

BACKGROUND

 

Part One of this action, in the amount of $7,799,461.75, consists of a small services 12-month master agreement for the installation of 3/4 inch to 2-inch water services and 6-inch wastewater connections, as requested by the Development Services Department, upon issuance of a permit to the property owner. The fees collected to provide these services will be applied to future small services agreements.

 

Part Two of this action, in the amount of $2,533,711.00, includes the installation of a 20-inch gate valve, approximately 50 linear feet of 6-inch and 400 linear feet of 8-inch water mains, and the installation of approximately 800 linear feet of 8-inch, 220 linear feet of 12-inch, and 960 linear feet of 18-inch wastewater mains. The existing water and wastewater mains were built between 1940 and 1955. These mains are contributing to an increase in maintenance costs as well as service interruptions. The installation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.

 

 

 

A portion of the Part Two work consists of the construction of approximately 600 linear feet of 18-inch wastewater mains to increase the wastewater capacity of a 135.5-acre sewershed serving approximately 523 properties (thereby facilitating and promoting increased economic development) in the north Oak Cliff area generally bounded by West 10th Street, North Tyler Street, West Neely Street, and North Zang Boulevard. The wastewater mains to be replaced and upsized in this area will be located within Zang Boulevard, West 7th Street, and North Beckley Avenue. A portion of the funding for the wastewater mains to be replaced and upsized in this area is sourced from 2017 General Obligation Bond Funds (Economic Development/Housing Proposition I - Council District 1 allocation).

 

Part Three of this action, in the amount of $3,361,257.05, includes water and wastewater main extensions and consists of a 12-month master agreement in support of small services that may require extension of the existing main. Also included are water and wastewater emergency main replacements and relocations, which will allow for quick response in support of Dallas Water Utilities’ operations.

 

The following chart illustrates Omega Contracting, Inc.’s contractual activities with the City of Dallas for the past three years:

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     0                     1                     0                                             0

Active Projects                     0                     0                     0                                             0

Change Orders                     0                     0                     0                                             0

Projects Requiring Liquidated Damages                     0                     0                     0                                             0

Projects Completed by Bonding Company                     0                     0                     0                                             0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     May 2023

Complete Construction                     May 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Wastewater Construction Fund

$  4,983,909.10

$0.00

$0.00

Water Construction Fund

$  4,601,864.40

$0.00

$0.00

Wastewater Capital Improvement F Fund

$  3,588,308.90

$0.00

$0.00

ECO (I) Fund (2017 General Obligation Bond Funds)

$     520,347.40

$0.00

$0.00

Total

$13,694,429.80

$0.00

$0.00

 

 

 

 

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$13,694,429.80

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

32.24%

100.00%

$13,694,429.80

This contract exceeds the M/WBE goal.

Omega Contracting, LLC - Local; Workforce - 48.00% Local

 

The following two bids with quotes were received and opened on February 17, 2023:

 

*Denotes successful bidder

 

Bidder                     Bid Amount

 

*Omega Contracting, Inc.                     $13,694,429.80

  2518 Chalk Hill Road

  Dallas, Texas 75212                     

North Texas Contracting Inc.                     $26,463,709.00

 

OWNER

 

Omega Contracting, Inc.

 

Luis Spinola, Owner

 

MAPS

 

Attached