File #: 24-2241    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/18/2024 In control: Department of Aviation
On agenda: 9/11/2024 Final action:
Title: Authorize Supplemental Agreement No. 1 to the engineering services contract with O'Brien Engineering, Inc. to provide construction administration services to Garages A and B pedestrian concourse heating, ventilation, and air conditioning (HVAC) and roof assessment for mechanical, electrical, plumbing, and structural infrastructure systems that support the demolition, removal, and installation of ten new rooftop HVAC units, two new and updated boilers, and five new air handling units, along with roof layered replacement at Dallas Love Field - Not to exceed $55,300.00, from $249,600.00 to $304,900.00 - Financing: Aviation Fund
Indexes: 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     September 11, 2024

COUNCIL DISTRICT(S):                     6

DEPARTMENT:                     Department of Aviation

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 1 to the engineering services contract with O’Brien Engineering, Inc. to provide construction administration services to Garages A and B pedestrian concourse heating, ventilation, and air conditioning (HVAC) and roof assessment for mechanical, electrical, plumbing, and structural infrastructure systems that support the demolition, removal, and installation of ten new rooftop HVAC units, two new and updated boilers, and five new air handling units, along with roof layered replacement at Dallas Love Field - Not to exceed $55,300.00, from $249,600.00 to $304,900.00 - Financing:  Aviation Fund

 

Body

BACKGROUND

 

The Dallas Love Field Garages A and B pedestrian concourse walkway was built in 2004 during the Love Field Modernization Program.  The roof and walkway have suffered from significant water infiltration issues and an unexpected increase in heating, ventilation, and air conditioning (HVAC) maintenance costs.

 

The project provides additional engineer services to furnish construction administration oversight on the demolition, removal, and installation of ten new rooftop HVAC units, two new and updated boilers, and five new air handling units, along with roof layered replacement.

 

This action will authorize Supplemental Agreement No. 1 to the engineering services contract with O’Brien Engineering, Inc. to provide construction administration services to Garages A and B pedestrian concourse HVAC and roof assessment for mechanical, electrical, plumbing, and structural infrastructure systems that support the demolition, removal, and installation of ten new rooftop HVAC units, two new and updated boilers, and five new air handling units, along with roof layered replacement at Dallas Love Field.

 

 

 

 

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          June 2023

Completed Design                                          January 2024

Begin Construction                     September 2024

Complete Construction                     September 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On May 24, 2023, the City Council authorized an engineering services contract with O’Brien Engineering, Inc. to provide engineering services for the analysis of Garage A and B pedestrian concourse walkway roof and heating, ventilation, and air conditioning (HVAC) system as well as other HVAC system around the garage/terminal area, correct existing deficiencies, bid phase and construction administration services at Dallas Love Field by Resolution No. 23-0688.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Aviation Fund

$55,300.00

$0.00

$0.00

 

Original Contract                                                                                                         $249,600.00

Supplemental Agreement No. 1 (this action)                     $  55,300.00

 

Total                                                                                                                                                   $304,900.00

 

DBE INFORMATION

 

In accordance with US CFR 49, Part 26 for Disadvantage Business Enterprise (DBE) participate on projects wholly or partly funded through federal grant dollars, the DBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

DBE Goal

$55,300.00

Construction

32.00%

DBE Subcontracting %

DBE Overall %

DBE Overall Participation $

0.00%

0.00%

$0.00

This contract does not meet the DBE goal but complies with good faith efforts.

O’Brien Engineering, Inc. - Local; Workforce - 10.00% Local

 

OWNER/EXECUTIVE

 

O’Brien Engineering, Inc.

 

Jim O’Brien, P.E., CFM, Principal

 

 

MAP

 

Attached