Legislation Details

File #: 26-2631A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/5/2026 In control: Dallas Water Utilities Department
On agenda: 9/23/2026 Final action:
Title: Authorize a professional services contract with T. M. Kilduff Consulting, Inc. dba Kilduff Underground Engineering to provide engineering services associated with the East Bank Interceptor Project - Not to exceed $3,487,729.00 - Financing: Wastewater Capital Improvement G Fund ($3,000,000.00) and Wastewater Capital Improvement F Fund ($487,729.00) *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: 2, 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     September 23, 2026

COUNCIL DISTRICT(S):                     2, 6

DEPARTMENT:                     Dallas Water Utilities Department

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with T. M. Kilduff Consulting, Inc. dba Kilduff Underground Engineering to provide engineering services associated with the East Bank Interceptor Project - Not to exceed $3,487,729.00 - Financing: Wastewater Capital Improvement G Fund ($3,000,000.00) and Wastewater Capital Improvement F Fund ($487,729.00)

 

*In alignment with Water and Wastewater Capital Improvement Program.

 

Body

BACKGROUND

 

On February 26, 2014, the City Council authorized a professional services contract with RPS Espey that included structural analysis, risk assessment, emergency action plan preparation, and evaluation of rehabilitation or replacement options for several wastewater interceptors in the Interstate Highway (IH) 30 and IH 35E downtown area.

 

After award of the contract, RPS Espey was acquired by Tetra Tech. Due to the pipe rehabilitation and trenchless technology specialty needed, Tetra Tech engaged the services of Kilduff Underground Engineering, Inc. (KUE). KUE’s evaluation of the 90-inch East Bank Horseshoe lnterceptor concluded that the existing wastewater interceptor is deteriorated throughout and rehabilitation would present significant access challenges and risk with a low confidence of accomplishing the repair objectives. There is less risk in constructing a new parallel sewer via tunneling than rehabilitating the existing sewer and a detailed evaluation of the potential alignment and ancillary structures is needed to move the project forward.

 

Since the existing East Bank Interceptor is already seen to have deteriorated at multiple locations, further delays in the design and construction of a replacement for the existing interceptor will exacerbate the risk of continued pipe deterioration, pipe collapse, and loss of wastewater operation and service to most of downtown Dallas. Therefore, for the next phase of the project, Dallas Water Utilities has engaged KUE to provide a scope of work and fee proposal for engineering services.

 

The professional services scope will include completing a site investigation, alignment study, preliminary design report for the selected alignments, geotechnical investigations, tunnel feasibility report, and 30 percent design level construction plans and specifications for a new 120-inch diameter interceptor to act as a replacement of the existing East Bank Horseshoe Interceptor. The additional services will ensure that a constructable tunnel alignment is selected based on ground conditions, site constraints, and project stakeholder impacts.

 

KUE is highly qualified to provide engineering services associated with the next phase of the East Bank Interceptor Project due to their long-time engagement on the East Bank Interceptor project, specialized expertise with tunneling, as well as their extensive work on the Lower East Bank Interceptor directly upstream. This experience and familiarity with the project provide them with an unmatched, comprehensive knowledge of the necessary improvements associated with this project. This action will authorize a professional services contract with T. M. Kilduff Consulting, Inc. dba Kilduff Underground Engineering to provide engineering services associated with the East Bank Interceptor Project.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                                          November 2026

Complete Services                                          December 2028

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

Information about this item was provided to the Transportation and Infrastructure Committee on September 14, 2026.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Wastewater Capital Improvement G Fund

$3,000,000.00

$0.00

$0.00

Wastewater Capital Improvement F Fund

$   487,729.00

$0.00

$0.00

Total

$3,487,729.00

$0.00

$0.00

 

Council District                                            Amount

 

                     2                                                               $1,997,084.58

                     6                                                               $1,490,644.42

 

       Total                                                               $3,487,729.00

 

OWNER/EXECUTIVE

 

T. M. Kilduff Consulting, Inc. dba Kilduff Underground Engineering

 

Todd Kilduff, PE, President

 

MAP

 

Attached