Legislation Details

File #: 24-2286    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/22/2024 In control: Water Utilities Department
On agenda: 9/25/2024 Final action:
Title: Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC, to provide additional engineering services required for raw water facility major maintenance and rehabilitation improvements at the Bachman Water Treatment Plant and Tawakoni Balancing Reservoir - Not to exceed $3,175,021.00, from $8,481,480.00 to $11,656,501.00 - Financing: Water Capital Improvement F Fund ($2,000,000.00), Water Capital Improvement G Fund ($1,050,000.00), and Water Construction Fund ($125,021.00)
Indexes: 200, 6
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     September 25, 2024

COUNCIL DISTRICT(S):                     6, Outside

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC, to provide additional engineering services required for raw water facility major maintenance and rehabilitation improvements at the Bachman Water Treatment Plant and Tawakoni Balancing Reservoir - Not to exceed $3,175,021.00, from $8,481,480.00 to $11,656,501.00 - Financing: Water Capital Improvement F Fund ($2,000,000.00), Water Capital Improvement G Fund ($1,050,000.00), and Water Construction Fund ($125,021.00)

 

Body

BACKGROUND

 

The initial phase of this project identified 10 raw water facilities for evaluation based on their age and condition, impact to system, reliability, cost to operate, and frequency of repairs. The facilities included intake structures, screening equipment, pump stations, valves, and pipelines located at the Tawakoni Balancing Reservoir and at intakes along the Elm Fork of the Trinity River and three Dallas Water Utilities (DWU) water supply reservoirs: Lake Ray Hubbard, Lake Tawakoni, and Lake Fork. Services included condition assessment, prioritization of needs, cost analyses of replacement or repair, and development of a business risk exposure value for each element of the water supply system evaluated. An asset management inventory with a risk-based scoring system was developed to determine the near term and future prioritization and phasing of improvements to the raw water facilities.

 

Supplemental Agreement No. 1 provided specialized investigations and evaluations identified during the initial phase and detailed engineering designs for critical raw water facility improvements. The critical raw water facilities included Lake Ray Hubbard Intake, Forney Pump Station, and Forney Dam. In addition, detailed field investigations, structural modeling, and operational assessments for Forney Dam and construction phase services associated with secured entry improvements at the East Side Water Treatment Plant were included in the scope of services.

 

Supplemental Agreement No. 2 provided bidding and construction phase services for the proposed improvements at the Lake Ray Hubbard Intake, Forney Pump Station, and Forney Dam.

The supplemental work also included the evaluation of risk to the utility before and after implementation of key raw water projects and an update to DWU’s business risk exposure across its raw water facilities. Special services included programming and integration support for planned improvements, and additional raw water facility evaluations and engineering as requested.

 

This action will authorize Supplemental Agreement No. 3 to provide survey, geotechnical investigation, preliminary design, final design, and bidding phase services for raw water facility improvements at the Bachman Water Treatment Plant. Supplemental Agreement No 3 will also include services to provide a final design for Tawakoni Balancing Reservoir improvements and bidding phase services. Future supplemental agreements may be necessary to provide construction phase services for these improvements and to provide additional design, bidding, and construction services for critical repairs identified in the raw water implementation plan as well as other raw water improvements.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services           September 2024

Complete Services     February 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On June 14, 2017, the City Council authorized an engineering services contract with Garver, LLC to perform an evaluation/study and preliminary design of major maintenance and rehabilitation improvements at Dallas Water Utilities’ raw water system facilities, by Resolution No. 17-0949.

 

On January 22, 2020, the City Council authorized Supplemental Agreement No. 1 to the professional services contract with Garver, LLC to provide design and additional engineering services required for major maintenance and rehabilitation improvements at Dallas Water Utilities’ raw water system facilities, by Resolution No. 20-0222.

 

On September 22, 2021, the City Council authorized Supplemental Agreement No. 2 to the professional services contract with Garver, LLC to provide additional engineering and construction phase services required for major maintenance and rehabilitation improvements at Dallas Water Utilities’ raw water system facilities, by Resolution No. 21-1588.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Water Capital Improvement F Fund

$2,000,000.00

$0.00

$0.00

Water Capital Improvement G Fund

$1,050,000.00

$0.00

$0.00

Water Construction Fund

$   125,021.00

$0.00

$0.00

Total

$3,175,021.00

$0.00

$0.00

 

Evaluation/Study                                                         $ 1,637,463.00

Supplemental Agreement No. 1                                 $ 4,949,190.00

Supplemental Agreement No. 2                                 $ 1,894,827.00

Supplemental Agreement No. 3 (this action)             $ 3,175,021.00

 

            Total amount not to exceed                            $11,656,501.00

 

Council District                                                                    Amount

 

            6                                                                                    $1,047,756.93

Outside City Limits                                                               $2,127,264.07

 

                     Total                                                                                    $3,175,021.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$3,175,021.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

36.77%

36.77%

$1,167,297.00

• This contract exceeds the M/WBE goal.

• Garver, LLC - Local; Workforce - 42.00% Local

 

OWNER/EXECUTIVE

 

Garver, LLC

 

Randall McIntyre, P.E., Vice President

 

MAPS

 

Attached