Title: Authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at Dallas Water Utilities Department's water distribution facilities - Not to exceed $3,290,060.00 - Financing: Water Capital Improvement G Fund *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: Citywide
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     June 24, 2026

COUNCIL DISTRICT(S):                     Citywide

DEPARTMENT:                     Dallas Water Utilities Department

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at Dallas Water Utilities Department’s water distribution facilities - Not to exceed $3,290,060.00 - Financing: Water Capital Improvement G Fund

 

*In alignment with Water and Wastewater Capital Improvement Program.

 

Body

BACKGROUND

 

The Dallas Water Utilities Department (DWU) provides treated drinking water and fire protection to approximately 2.65 million people through an extensive water delivery system. DWU’s water distribution infrastructure includes numerous potable water pump stations and pumps, water storage tanks, pressure reducing valves, and more than 5,000 miles of transmission and distribution mains. As these facilities age and system demands increase, DWU must continue to plan, prioritize, and implement strategic major maintenance improvements to ensure reliability, regulatory compliance, and operational efficiency across the water delivery network. 

 

This action will authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at 22 additional water distribution facilities. The engineer will prepare a 30 percent preliminary design assessment for high-priority major maintenance improvements across these facilities, including Sorcey Pump Station, 19 additional pump stations, and three elevated storage tanks. The project will document existing conditions, evaluate facility needs, develop preliminary design concepts and cost estimates, and produce a ranked list of construction projects aligned with DWU’s operational goals, long-term planning, and budget constraints. Detailed engineering design, bidding, and construction phase services will be authorized under a future supplemental agreement after completion of the assessment and preliminary design.

 

Completion of this assessment and preliminary design effort will provide DWU with a clear data-driven plan for near-term major maintenance investments that enhance system reliability, improve operability, and reduce life-cycle risks across critical distribution facilities.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                                          July 2026

Complete Services                                          July 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Water Capital Improvement G Fund

$3,290,060.00

$0.00

$0.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

Kimley-Horn and Associates, Inc.

Local

43.73%

 

PROCUREMENT INFORMATION

 

In accordance with the City of Dallas Administrative Directive 4-05 procurement Kimley Horn and Associates, Inc. was selected as the most qualified consultant for this project.

 

OWNER/EXECUTIVE

 

Kimley-Horn and Associates, Inc.

 

Kevin Hoppers, P.E., Senior Vice President

 