File #: 23-980    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 3/29/2023 In control: Department of Transportation
On agenda: 4/26/2023 Final action:
Title: Authorize the (1) acceptance of Regional Toll Revenue Funds from the State of Texas, acting by and through the Texas Department of Transportation (TxDOT), for a Roadway Reconstruction Off State System Project (Agreement No. CSJ 0918-47-421) in the amount of $5,600,000.00 as state contribution to the total project cost of $7,000,000.00 (State contribution from State Highway 121 Subaccount of $5,600,000.00 and the City of Dallas local match of $1,400,000.00 totaling $7,000,000.00) for the reconstruction of a 2-lane to 2-lane roadway including sidewalks, crosswalks, drainage, intersection improvements, streetlights, and potential traffic signals, if warranted, on Eads/Hutchins Avenue from Eads Avenue and East Colorado Boulevard to Hutchins Avenue and 8th Street in the City of Dallas; (2) receipt and deposit of funds in the amount of $5,600,000.00 in the Hutchins - Eads/Colorado to Hutchins/8th - RTR Fund; (3) establishment of appropriations in the amount of $5,600,000.00 in the Hutchins -...
Indexes: 4
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     April 26, 2023

COUNCIL DISTRICT(S):                     4

DEPARTMENT:                     Department of Transportation

EXECUTIVE:                     Dr. Robert Perez

______________________________________________________________________

SUBJECT

 

title

Authorize the (1) acceptance of Regional Toll Revenue Funds from the State of Texas, acting by and through the Texas Department of Transportation (TxDOT), for a Roadway Reconstruction Off State System Project (Agreement No. CSJ 0918-47-421) in the amount of $5,600,000.00 as state contribution to the total project cost of $7,000,000.00 (State contribution from State Highway 121 Subaccount of $5,600,000.00 and the City of Dallas local match of $1,400,000.00 totaling $7,000,000.00) for the reconstruction of a 2-lane to 2-lane roadway including sidewalks, crosswalks, drainage, intersection improvements, streetlights, and potential traffic signals, if warranted, on Eads/Hutchins Avenue from Eads Avenue and East Colorado Boulevard to Hutchins Avenue and 8th Street in the City of Dallas; (2) receipt and deposit of funds in the amount of $5,600,000.00 in the Hutchins - Eads/Colorado to Hutchins/8th - RTR Fund; (3) establishment of appropriations in the amount of $5,600,000.00 in the Hutchins - Eads/Colorado to Hutchins/8th - RTR Fund; (4) disbursement of funds in the amount of $7,000,000.00 from the Hutchins - Eads/Colorado to Hutchins/8th - RTR Fund ($5,600,000.00) and the Street and Transportation (A) Fund ($1,400,000.00); and (5) execution of the Advance Funding Agreement with TxDOT and all terms, conditions, and documents required by the agreement - Total amount of $7,000,000.00 - Financing: Texas Department of Transportation Grant Funds ($5,600,000.00) and Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($1,400,000.00)

 

body

BACKGROUND

 

The State of Texas received Regional Toll Revenue (RTR) Funds from the North Texas Tollway Authority as surplus revenue from the State Highway (SH) 121 toll project. Pursuant to Transportation Code, 228.006, the State of Texas shall authorize the use of surplus revenue from a toll project for transportation projects, highway projects, or air quality projects within the Texas Department of Transportation (TxDOT) district in which any part of the toll project is located. The Regional Transportation Council (RTC), which is the transportation policy body of the North Central Texas Council of Governments and the federally designated metropolitan planning organization for the Dallas-Fort Worth Metropolitan Area, was designated by the Texas Transportation Commission on October 26, 2006, to select and oversee projects to be financed using RTR Funds.

 

The City of Dallas desires to enter into an Advanced Funding Agreement (AFA) with the State of Texas, acting by and through TxDOT, to accept RTR Funds for the reconstruction of a 2-lane to 2-lane roadway including sidewalks, crosswalks, drainage, intersection improvements, streetlights, and potential traffic signals, if warranted, on Eads/Hutchins Avenue from Eads Avenue and East Colorado Boulevard to Hutchins Avenue and 8th Street in the City of Dallas (“Project”).

 

The RTC selected the Project to be funded from the SH 121 Subaccount, and the Texas Transportation Commission provided concurrence and authorization for the expenditure by Minute Order No. 116386, dated November 16, 2022.

 

The total estimated project cost is $7,000,000.00 and includes $5,600,000.00 in State participation and 20% local participation in the amount of $1,400,000.00 for engineering and construction costs.

 

This action will authorize an AFA with TxDOT to accept RTR Funds from the SH 121 Subaccount for construction of the Project and local participation in the amount of $1,400,000.00 for engineering and construction costs.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                                               September 2023

Complete Design                                          May 2025

Begin Construction                                           October 2025

Complete Construction                     October 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Texas Department of Transportation Grant Funds

$360,000.00

$360,000.00

$4,880,000.00

Street and Transportation (A) Fund (2017 General Obligation Bond Fund)

$  90,000.00

$  90,000.00

$1,220,000.00

Total

$450,000.00

$450,000.00

$6,100,000.00

 

State Participation (SH 121 Subaccount Funds)                     $5,600,000.00

City of Dallas Match                     $1,400,000.00

 

Total Project Cost                     $7,000,000.00

 