Title: Authorize a construction services contract for storm drainage improvements at two locations (List attached to the Agenda Information Sheet) - SYB Construction Co., Inc., lowest responsible bidder of five - Not to exceed $12,334,608.00 - Financing: Storm Drainage Management Capital Construction Fund ($7,340,393.00), Wastewater Capital Improvement G Fund ($2,353,135.00), Water Capital Improvement G Fund ($2,305,620.00) and 2025 Certificate of Obligation Fund ($335,460.00)
Indexes: 1, 10
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Sustainable

AGENDA DATE:                     August 13, 2025

COUNCIL DISTRICT(S):                     1, 10

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for storm drainage improvements at two locations (List attached to the Agenda Information Sheet) - SYB Construction Co., Inc., lowest responsible bidder of five - Not to exceed $12,334,608.00 - Financing: Storm Drainage Management Capital Construction Fund ($7,340,393.00), Wastewater Capital Improvement G Fund ($2,353,135.00), Water Capital Improvement G Fund  ($2,305,620.00) and 2025 Certificate of Obligation Fund ($335,460.00)

 

Body

BACKGROUND

 

This action will authorize a construction services contract with SYB Construction Co., Inc. for storm drainage improvements to address localized flooding and dam seepage issues.  The construction project includes storm drainage improvements in the vicinity of Guildhall Road and McCree Road, draining to Audelia Road and Northwest Highway, then to White Rock Creek.  The construction work will consist of outfall improvements, removing and replacing existing storm drainage pipes, and capacity improvements to the existing drainage systems. The construction contract also includes dam seepage remediation at Lake Cliff Dam.  The dam remediation construction work will address the seepage issues near the toe of Lake Cliff Dam in Oak Cliff Founders Park.

 

In addition to storm drainage improvements, the contract will include water and wastewater main replacements in the Guildhall Drive and McCree Road vicinity. The water and wastewater main replacements will address substandard water and wastewater mains in the same project areas as the storm drainage improvements. This includes the installation of approximately 11,152 feet of water and wastewater mains ranging in size from 6-inch to 24-inch in diameter. The existing water and wastewater mains were built between 1955 and 1960.   These mains are contributing to an increase in maintenance costs, as well as service interruptions. The installation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.

 

The following chart illustrates SYB Construction Co., Inc.’s contractual activities with the City of Dallas for the past three years:

 

                                                                                                                                                   AVI                     DWU                     PKR                     TPW

 

Projects Completed                                                                                                            0                        1                        0                        0

Active Projects                                                                                                               0                        4                        0                        0

Change Orders                                                                                                                  0                         0                        0                        0

Projects Requiring Liquidated Damages                                             0                        0                        0                        0

Projects Completed by Bonding Company                        0                        0                         0                        0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          October 2025

Complete Construction                     April 2027

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

Storm Drainage Management Capital Construction Fund

$  7,340,393.00

$0.00

$0.00

Wastewater Capital Improvement G Fund

$  2,353,135.00

$0.00

$0.00

Water Capital Improvement G Fund

$  2,305,620.00

$0.00

$0.00

2025 Certificate of Obligation Fund

$     335,460.00

$0.00

$0.00

Total

$12,334,608.00

$0.00

$0.00

 

Council District                                           Amount

 

1                      $     335,460.00

                    10                     $11,999,148.00

 

       Total                      $12,334,608.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

SYB Construction Co., Inc

Non-local

30.71%

 

 

 

 

 

 

 

 

PROCUREMENT INFORMATION

 

The following five bids with quotes were received on May 9, 2025:

 

*Denotes successful bidder

 

Bidders                                                                                                                                                     Bid Amount

 

*SYB Construction Co., Inc.                                                                                    $12,334,608.00

 1017 S FM 157

 Venus, TX 76084

Western Municipal Construction of Texas LLC                                          $13,378,635.00

Omega Contracting, LLC                                                                                                            $13,684,105.00

Camino Construction, L.P.                                                                                                         $16,397,930.00

John Burns Construction Company of Texas, LLC                     $17,103,511.00

 

OWNER/EXECUTIVE

 

SYB Construction Company, Inc.

 

Brian Wood, Vice President

 

MAPS

 