Legislation Details

File #: 26-2904A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/27/2026 In control: Department of Transportation and Public Works
On agenda: 10/28/2026 Final action:
Title: Authorize (1) an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for a U.S. Department of Transportation Federal Highway Administration federal-aid project (Agreement No. CSJ 0047-07-250, Assistance Listing No. 20.205) in the amount of $708,832.54 for reimbursement of materials and labor costs incurred by the City for the construction of traffic signals at five intersections: U.S (US) Highway 75 (US 75) at Lovers Lane, US 67 at Wheatland Road, US 67 at Camp Wisdom Road, Interstate Highway 20 at Polk Street, and State Highway 190 at Rosemeade Parkway, and for the retiming of directly impacted traffic signals within the project areas; (2) the establishment of appropriations in the amount of $708,832.54 in the TxDOT HSIP 5-Signals Reimbursement Fund; (3) the receipt and deposit of funds in the amount of $708,832.54 in the TxDOT HSIP 5-Signals Reimbursement Fund; and (4) execution of the agreement and all terms, conditions, and documents required by the agreem...
Indexes: 12, 13, 3, 8
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     October 28, 2026

COUNCIL DISTRICT(S):                     3, 8, 12, 13

DEPARTMENT:                     Department of Transportation and Public Works

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for a U.S. Department of Transportation Federal Highway Administration federal-aid project (Agreement No. CSJ 0047-07-250, Assistance Listing No. 20.205) in the amount of $708,832.54 for reimbursement of materials and labor costs incurred by the City for the construction of traffic signals at five intersections: U.S (US) Highway 75 (US 75) at Lovers Lane, US 67 at Wheatland Road, US 67 at Camp Wisdom Road, Interstate Highway 20 at Polk Street, and State Highway 190 at Rosemeade Parkway, and for the retiming of directly impacted traffic signals within the project areas; (2) the establishment of appropriations in the amount of $708,832.54 in the TxDOT HSIP 5-Signals Reimbursement Fund; (3) the receipt and deposit of funds in the amount of $708,832.54 in the TxDOT HSIP 5-Signals Reimbursement Fund; and (4) execution of the agreement and all terms, conditions, and documents required by the agreement - Total amount of $708,832.54 - Financing: TxDOT HSIP 5-Signals Reimbursement Fund

 

*In alignment with Vision Zero Plan.

 

Body

BACKGROUND

 

TxDOT is constructing traffic signals and associated on-system intersection improvements at the following five intersections: US 75 at Lovers Lane (CSJ No. 0047-07-250), US 67 at Wheatland Road (CSJ No. 0261-02-085), US 67 at Camp Wisdom Road (CSJ No. 0261-03-071), Interstate Highway (IH) 20 at Polk Street (CSJ No. 2374-04-099), and State Highway (SH) 190 at Rosemeade Parkway (CSJ No. 2964-04-012). The project will include the construction of new traffic signals; pedestrian and Americans with Disabilities Act (ADA)-related improvements; the retiming of directly impacted traffic signals within the project areas; and other related improvements.

 

 

 

 

 

Project                                                                                                                                                                        Council District

 

US 75 at Lovers Lane (CSJ No. 0047-07-250)                                                                                    13

US 67 at Wheatland Road (CSJ No. 0261-02-085)                                                               3

US 67 at Camp Wisdom Road (CSJ No. 0261-03-071)                                          3

IH 20 at Polk Street (CSJ No. 2374-04-099)                                                                                    8

SH 190 at Rosemeade Parkway (CSJ No. 2964-04-012)                                          12

 

To maintain consistency with equipment used throughout the citywide traffic signal system, the City of Dallas will provide traffic signal controllers and cabinets, radar detection equipment, traffic signs, and battery backup equipment for the project. TxDOT will reimburse the City for the associated materials and labor costs.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          February 2027

Complete Construction                     February 2028

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2027

FY 2028

Future Years

TxDOT HSIP 5-Signals Reimbursement Fund

$708,832.54

$0.00

$0.00

 

Council District                                                               Amount

 

3                                                                                    $283,364.14

8                                                                                    $142,747.18

12                                                                                    $142,747.18

13                                                                                    $139,974.04

 

 Total                                                                                                         $708,832.54

 

MAP

 

Attached