Legislation Details

File #: 24-1695    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/14/2024 In control: Water Utilities Department
On agenda: 8/14/2024 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Halff Associates, Inc. for additional engineering services associated with drainage studies, preliminary design, and development of construction plans and specifications for storm drainage system and erosion control improvements at two locations - Not to exceed $758,400.00, from $791,300.00 to $1,549,700.00 - Financing: 2024 Certificate of Obligation Fund
Indexes: 3, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     August 14, 2024

COUNCIL DISTRICT(S):                     3, 9

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 1 to the professional services contract with Halff Associates, Inc. for additional engineering services associated with drainage studies, preliminary design, and development of construction plans and specifications for storm drainage system and erosion control improvements at two locations - Not to exceed $758,400.00, from $791,300.00 to $1,549,700.00 - Financing: 2024 Certificate of Obligation Fund

 

Body

BACKGROUND

 

On June 22, 2022, the City Council authorized a professional services contract with Halff Associates, Inc. for the evaluation and design of erosion control and storm drainage system improvements at three locations. Two locations now require additional services following completion of engineering evaluations and preliminary engineering efforts. Those locations include Hardin Creek along Kiesthill Drive, Kiestcrest Drive, and Kiest Forest Drive, and McCommas Branch at Wendover Road and Sperry Street.

 

Full design of erosion control improvements were completed at the highest priority area of 3604 and 3610 Kiestcrest Drive and have been awarded for construction. Engineering evaluations and conceptual designs were completed along the 3300-3400 blocks of Kiesthill Drive and Kiest Forest Drive and funding is now available to move forward with detailed design for erosion control improvements. At McCommas Branch, additional services are needed for alternative analysis of Wendover and Sperry Street crossings to evaluate valley storage requirements, utility relocations, survey and easement document preparation, and cultural resource assessments to complete hydraulic improvements.

 

This action will authorize Halff Associates, Inc. to provide additional services necessary to complete engineering designs and develop final plans and specifications for drainage and erosion control improvements along Hardin Creek and two locations along McCommas Branch. The proposed design improvements will stabilize eroding stream banks and improve the existing drainage and flood control systems.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          July 2022

Complete Design                                          March 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On June 22, 2022, the City Council authorized a professional services contract with Halff Associates, Inc. to provide engineering services for storm drainage and erosion control improvements at three locations by Resolution No. 22-0996.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

2024 Certificate of Obligation Fund

$758,400.00

$0.00

$0.00

 

Original Contract                                                                                                         $   791,300.00

Supplemental Agreement No. 1 (this action)                     $   758,400.00

 

Project Total                                                                                                                              $1,549,700.00

 

 

                     Council District                                             Amount

 

                                          3                                                               $673,300.00

                                          9                                                               $  85,100.00

 

Total Project Cost                                          $758,400.00

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$758,400.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

34.00%

34.00%

$257,856.00

• This contract meets the M/WBE goal.

• Supplemental Agreement No. 1 - 34.01% Overall MWBE participation

• Halff Associates, Inc- Local; Workforce - 17.00% Local

 

OWNER

 

Halff Associates, Inc.

 

Mark Edwards, President

 

MAP

 