Skip to main content
Dallas Logo
File #: 25-2592A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/19/2025 In control: Department of Transportation and Public Works
On agenda: 11/12/2025 Final action:
Title: Authorize a professional engineering services contract with Lee Engineering, LLC, the most highly qualified proposer specifically for traffic signal design services for the four intersections in Group 2 as follows: West 12th Street at South Madison Avenue, including a fiber interconnect to South 12th Street at South Bishop Avenue; East 11th Street at South Corinth Street; Worcola Street at University Crossing Trail; 1670 West Camp Wisdom Road (pedestrian signal with advanced flashers); and other related tasks - Not to exceed $384,104.00 - Financing: Street and Transportation (A) Fund (2024 General Obligation Bond Fund) ($288,078.00) and General Fund ($96,026.00) *In alignment with Infrastructure Management Plan.
Indexes: 1, 4, 8, 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     November 12, 2025

COUNCIL DISTRICT(S):                     1, 4, 8, 9

DEPARTMENT:                     Department of Transportation and Public Works

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional engineering services contract with Lee Engineering, LLC, the most highly qualified proposer specifically for traffic signal design services for the four intersections in Group 2 as follows: West 12th Street at South Madison Avenue, including a fiber interconnect to South 12th Street at South Bishop Avenue; East 11th Street at South Corinth Street; Worcola Street at University Crossing Trail; 1670 West Camp Wisdom Road (pedestrian signal with advanced flashers); and other related tasks - Not to exceed $384,104.00 - Financing: Street and Transportation (A) Fund (2024 General Obligation Bond Fund) ($288,078.00) and General Fund ($96,026.00)

 

*In alignment with Infrastructure Management Plan.

 

Body

BACKGROUND

 

On October 9, 2024, the City of Dallas released Request for Qualifications “CIZ24-PBW-3124 Streets and Transportation Design Services for Special Projects” for professional engineering services for various transportation infrastructure projects including streets, alleys, sidewalks, trails, and special services for traffic signals, street lighting/pedestrian lighting, permanent traffic signs, bicycle lane design, traffic studies, data gathering, permanent paving markings, intersection improvements, and railroad quiet zones.

 

Lee Engineering, LLC was selected as the most highly qualified proposer to provide traffic signal design services for the four intersections in Group 2 as follows:

 

Intersection                                                                                                                                                                                             Council District

 

                     West 12th Street at South Madison Avenue/                                                                                    1

South 12th Street at South Bishop Avenue

                     East 11th Street at South Corinth Street                                                                                                         4

                     1670 West Camp Wisdom Road                                                                                                                               8

(pedestrian signal with advanced flashers)                                                                                    

                     Worcola Street at University Crossing Trail                                                                                    9

 

If approved, this action will authorize a professional engineering services contract with Lee Engineering, LLC to support the warranted installation or upgrade of traffic signal infrastructure at these intersections to improve traffic efficiency and safety.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                                               November 2025

Complete Design                                          November 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Street and Transportation (A) Fund (2024 General Obligation Bond Fund)

$216,058.50

$72,019.50

$0.00

General Fund

$  72,019.50

$24,006.50

$0.00

Total

$288,078.00

$96,026.00

$0.00

 

Council District                                               Amount

 

1                                                               $  96,026.00

4                                                               $  96,026.00

8                                                               $  96,026.00

9                                                               $  96,026.00

 

        Total                                                               $384,104.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

Lee Engineering, LLC

Local

11.76%

 

PROCUREMENT INFORMATION

 

In accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines, Lee Engineering, LLC was selected as the most highly qualified proposer to provide traffic signal design services for this project.

 

OWNER/EXECUTIVE

 

Lee Engineering, LLC

 

Dharmesh Shah, Vice President

 

MAP

 

Attached