Legislation Details

File #: 26-1906A    Version: 1 Name:
Type: CONSENT AGENDA Status: Deleted
File created: 5/27/2026 In control: Dallas Water Utilities Department
On agenda: 8/12/2026 Final action:
Title: Authorize a construction services contract for the installation and rehabilitation of water and wastewater mains at seven locations (list attached to Agenda Information Sheet) - Muniz Construction, Inc., lowest responsible bidder of six - Not to exceed $23,480,220.00 - Financing: Water Capital Improvement F Fund ($6,269,948.74), Water (Drinking Water) - TWDB 2020 Fund ($5,482,390.03), Wastewater Capital Improvement F Fund ($4,547,277.84), Water (Drinking Water) - TWDB 2019 Fund ($3,388,806.23), Water Construction Fund ($1,611,447.50), Wastewater (Clean Water) - TWDB 2021 Fund ($1,452,720.49), and Wastewater (Clean Water) - TWDB 2020 Fund ($727,629.17) *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: 14
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     August 12, 2026

COUNCIL DISTRICT(S):                     14

DEPARTMENT:                     Dallas Water Utilities Department

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for the installation and rehabilitation of water and wastewater mains at seven locations (list attached to Agenda Information Sheet) - Muniz Construction, Inc., lowest responsible bidder of six - Not to exceed $23,480,220.00 - Financing: Water Capital Improvement F Fund ($6,269,948.74), Water (Drinking Water) - TWDB 2020 Fund ($5,482,390.03), Wastewater Capital Improvement F Fund ($4,547,277.84), Water (Drinking Water) - TWDB 2019 Fund ($3,388,806.23), Water Construction Fund ($1,611,447.50), Wastewater (Clean Water) - TWDB 2021 Fund ($1,452,720.49), and Wastewater (Clean Water) - TWDB 2020 Fund ($727,629.17) 

 

*In alignment with Water and Wastewater Capital Improvement Program.

 

Body

BACKGROUND

 

This action will authorize a construction services contract with Muniz Construction, Inc. for the installation and rehabilitation of approximately 22,692 feet of water and wastewater mains at seven locations. The contract includes the installation of approximately 220 feet of 4-inch; 700 feet of 6-inch; 644 feet of 8-inch; 7,800 feet of 12-inch; 1,600 feet of 16-inch; and 2,838 feet of 24-inch diameter water mains. In addition, the contract includes the installation and rehabilitation of approximately 5,100 feet of 8-inch; 1,740 feet of 10-inch; 1,400 feet of 12-inch; 330 feet of 15-inch; and 320 feet of 16-inch diameter wastewater mains.

 

The proposed pipeline segments were initially awarded as part of another Dallas Water Utilities Department (DWU) construction contract for the installation and rehabilitation of water and wastewater main improvements at various locations. However, the contractor had several payment disputes with subcontractors, submitted unreasonable payment claims, and unilaterally demobilized without completing all the contracted work. Despite exhaustive efforts by DWU and the City Attorney to work with the contractor and surety company, neither upheld their contractual obligation to complete the work. This ultimately prompted the City to terminate the original contract and pursue completion under a separate bid contract.

 

The existing water and wastewater mains planned for replacement and rehabilitation were built between 1916 and 1982. These mains are contributing to an increase in maintenance costs, as well as service interruptions. Installation and rehabilitation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.

 

The following chart illustrates Muniz Construction, Inc.’s contractual activities with the City of Dallas for the past three years:

 

AVI                     DWU                     PKR                     TPW

 

Projects Completed                     0                     2                     0                     0

Active Projects                     0                     5                     0                     0

Change Orders                     0                     1                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          October 2026

Complete Construction                     December 2028

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

Water Capital Improvement F Fund

$6,269,948.74

$0.00

$0.00

Water (Drinking Water) - TWDB 2020 Fund

$5,482,390.03

$0.00

$0.00

Wastewater Capital Improvement F Fund

$4,547,277.84

$0.00

$0.00

Water (Drinking Water) - TWDB 2019 Fund

$3,388,806.23

$0.00

$0.00

Water Construction Fund

$1,611,447.50

$0.00

$0.00

Wastewater (Clean Water) - TWDB 2021 Fund

$1,452,720.49

$0.00

$0.00

Wastewater (Clean Water) - TWDB 2020 Fund

$    727,629.17

$0.00

$0.00

Total

$23,480,220.00

$0.00

$0.00

 

 

 

 

 

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

Muniz Construction, Inc.

Local

100.00%

 

PROCUREMENT INFORMATION

 

The following six bids with quotes were received on April 17, 2026:

 

*Denotes successful bidder

 

Bidders                                                                                                                                                       Bid Amount

 

*Muniz Construction, Inc.                                                                                                 $23,480,220.00

 1835 Garden Springs Drive

 Dallas, Texas 75253

Western Municipal Construction of Texas, LLC                          $27,087,643.94

SYB Construction Co., Inc.                                                                                                  $27,959,019.00

Douglas Dailey Construction, LLC                                                               $39,958,060.00

John Burns Construction Company of Texas, LLC                     $52,571,543.00

Camino Construction, L.P.                                                                                               **Withdrew Bid

 

**Camino Construction, L.P. withdrew their bid after bids were opened and refused to move forward because of clerical errors and alleged mistakes within their bid.

 

OWNER/EXECUTIVE

 

Muniz Construction, Inc.

 

J. Ramon Muniz, President

 

MAPS

 

Attached