Authorize (1) a construction services contract for reconstruction of the C3 and Reves Galleries at the Dallas Museum of Art, located at 1717 North Harwood Street - Big Sky Construction Company, Inc., most advantageous proposer of ten; (2) all actions necessary to file insurance claims; (3) a transfer of funds in an amount not to exceed $4,000,000.00 from the General Fund Contingency Reserve Fund to the 2022 Severe Weather and Flood Fund; and (4) an increase in appropriations in an amount not to exceed $4,000,000.00 in the Severe Weather and Flood Fund - Not to exceed $6,070,000.00 - Financing: 2022 Severe Weather and Flood Fund
Body
BACKGROUND
On August 22, 2022, the Dallas area experienced torrential rainstorms that caused damage to the Dallas Museum of Art. The rain caused the Reves Gallery courtyard drains to be overcome and water to flood into the Reves Gallery. Subsequently, due to the gallery raised floor assembly, the water entering the space dropped below the floor and ran under it spreading throughout the Reves Gallery. The water beneath the floor then descended into the C3 Gallery below through various floor penetrations, including but not limited to, electrical, mechanical, plumbing, and building seams. In response, cleanup and bulk water extraction was started and completed in the areas. The water damaged building components including, but not limited to, floors, walls, ceilings, and other building components contained within, were assessed, and removed as required throughout the C3 and Reves Galleries in coordination with the performance of mold remediation.
Corgan Architects was selected to provide architectural design documentation and planning services for the reconstruction efforts for the Dallas Museum of Art. The firm was selected from the Aviation Department’s pre-qualified list of consultants, Solicitation No. CIZ1959, and established a contract through Administrative Action No. 23-5437 on February 24, 2023.
Big Sky Construction Company, Inc. has completed no contractual activities with the City of Dallas within the past three years.
ESTIMATED SCHEDULE OF PROJECT
Begin Construction January 2025
Complete Construction January 2026
PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)
On December 14, 2022, the City Council authorized the City Manager to increase appropriations in an amount not to exceed $6,810,500.00 in the 2022 Severe Weather and Flood Fund, Fund 0790, Department BMS, Unit 2394, Object 3099 to repair damage to City facilities as a result of the severe weather event by Resolution No. 22-1745.
FISCAL INFORMATION
Fund |
FY 2025 |
FY 2026 |
Future Years |
2022 Severe Weather and Flood Fund |
$6,070,000.00 |
$0.00 |
$0.00 |
M/WBE INFORMATION
In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:
Contract Amount |
Procurement Category |
M/WBE Goal |
$6,070,000.00 |
Construction |
32.00% |
M/WBE Subcontracting % |
M/WBE Overall % |
M/WBE Overall Participation $ |
36.86% |
36.86% |
$2,237,697.00 |
• This contract exceeds the M/WBE goal. |
• Big Sky Construction Co., Inc. - Local; Workforce - 0.00% Local |
PROCUREMENT INFORMATION
On July 31 and August 7, 2024, the request for competitive sealed proposals for reconstruction of the Dallas Museum of Art was advertised in accordance with City of Dallas purchasing guidelines. The following 10 proposals were received and opened on September 13, 2024. The proposers were ranked as follows:
*Denotes successful proposer
Proposers Address Rank
*Big Sky Construction Co., Inc. 507 Exposition Avenue 1
Dallas Texas 75226
JC Commercial, Inc. 1801 Lakepointe Drive, Suite 129 2
Lewisville Texas 75057
Post L Group LLC 2341 Blue Smoke Court North 3
Fort Worth Texas 76105
J.B. & Co. LLC 2626 Cole Avenue, Suite 300 4
Dallas Texas 75204
Azteca Enterprises, LLC 2518 Chalk Hill Road 5
Dallas Texas 75212
ICGM Group 619 W Main Street Non-responsive
Oklahoma City Oklahoma 73102
Triton General Contractor 102 S Goliad Street, Suite 108 Non-responsive
Rockwall Texas 75087
Solotech U.S . Corporation 7970 S Valley View Boulevard Non-responsive
Ste. 100
Las Vegas Nevada 89139
Futurism Designs 1115 Royal Lane Non-responsive
Dallas Texas 75229
Restoration Nation 2700 Corzine Drive Non-responsive
Arlington Texas 76013
**Five firms were deemed non-responsive for not submitting a full proposal for the project.
OWNER/EXECUTIVE
Big Sky Construction Co., Inc.
Bob Long, President