Title: Authorize (1) a construction services contract for reconstruction of the C3 and Reves Galleries at the Dallas Museum of Art, located at 1717 North Harwood Street - Big Sky Construction Company, Inc., most advantageous proposer of ten; (2) all actions necessary to file insurance claims; (3) a transfer of funds in an amount not to exceed $4,000,000.00 from the General Fund Contingency Reserve Fund to the 2022 Severe Weather and Flood Fund; and (4) an increase in appropriations in an amount not to exceed $4,000,000.00 in the Severe Weather and Flood Fund - Not to exceed $6,070,000.00 - Financing: 2022 Severe Weather and Flood Fund
Indexes: 14
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Government Performance and Financial Management

AGENDA DATE:                     January 8, 2025

COUNCIL DISTRICT(S):                     14

DEPARTMENT:                     Department of Facilities and Real Estate Management

EXECUTIVE:                     Donzell Gipson

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) a construction services contract for reconstruction of the C3 and Reves Galleries at the Dallas Museum of Art, located at 1717 North Harwood Street - Big Sky Construction Company, Inc., most advantageous proposer of ten; (2) all actions necessary to file insurance claims; (3) a transfer of funds in an amount not to exceed $4,000,000.00 from the General Fund Contingency Reserve Fund to the 2022 Severe Weather and Flood Fund; and (4) an increase in appropriations in an amount not to exceed $4,000,000.00 in the Severe Weather and Flood Fund - Not to exceed $6,070,000.00  - Financing:  2022 Severe Weather and Flood Fund

 

Body

BACKGROUND

 

On August 22, 2022, the Dallas area experienced torrential rainstorms that caused damage to the Dallas Museum of Art.  The rain caused the Reves Gallery courtyard drains to be overcome and water to flood into the Reves Gallery.  Subsequently, due to the gallery raised floor assembly, the water entering the space dropped below the floor and ran under it spreading throughout the Reves Gallery.  The water beneath the floor then descended into the C3 Gallery below through various floor penetrations, including but not limited to, electrical, mechanical, plumbing, and building seams.  In response, cleanup and bulk water extraction was started and completed in the areas.  The water damaged building components including, but not limited to, floors, walls, ceilings, and other building components contained within, were assessed, and removed as required throughout the C3 and Reves Galleries in coordination with the performance of mold remediation. 

 

Corgan Architects was selected to provide architectural design documentation and planning services for the reconstruction efforts for the Dallas Museum of Art.  The firm was selected from the Aviation Department’s pre-qualified list of consultants, Solicitation No. CIZ1959, and established a contract through Administrative Action No. 23-5437 on February 24, 2023.

 

Big Sky Construction Company, Inc. has completed no contractual activities with the City of Dallas within the past three years.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          January 2025

Complete Construction                     January 2026

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On December 14, 2022, the City Council authorized the City Manager to increase appropriations in an amount not to exceed $6,810,500.00 in the 2022 Severe Weather and Flood Fund, Fund 0790, Department BMS, Unit 2394, Object 3099 to repair damage to City facilities as a result of the severe weather event by Resolution No. 22-1745.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

2022 Severe Weather and Flood Fund

$6,070,000.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$6,070,000.00

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

36.86%

36.86%

$2,237,697.00

This contract exceeds the M/WBE goal.

Big Sky Construction Co., Inc. - Local; Workforce - 0.00% Local

 

PROCUREMENT INFORMATION

 

On July 31 and August 7, 2024, the request for competitive sealed proposals for reconstruction of the Dallas Museum of Art was advertised in accordance with City of Dallas purchasing guidelines.  The following 10 proposals were received and opened on September 13, 2024.  The proposers were ranked as follows:

 

*Denotes successful proposer

 

 

 

 

 

 

Proposers                                                                                    Address                                                                                    Rank

 

*Big Sky Construction Co., Inc.                     507 Exposition Avenue                                              1

                                                                                                         Dallas Texas 75226

 

JC Commercial, Inc.                                          1801 Lakepointe Drive, Suite 129     2

                                                                                                         Lewisville Texas 75057

 

Post L Group LLC                                                               2341 Blue Smoke Court North                         3

                                                                                                         Fort Worth Texas 76105

 

J.B. & Co. LLC                                                               2626 Cole Avenue, Suite 300                         4

                                                                                                         Dallas Texas 75204

 

Azteca Enterprises, LLC                                          2518 Chalk Hill Road                                              5

                                                                                                         Dallas Texas 75212

 

ICGM Group                                                                                    619 W Main Street                                                                   Non-responsive

                                                                                                         Oklahoma City Oklahoma 73102

 

Triton General Contractor                                          102 S Goliad Street, Suite 108                         Non-responsive

                                                                                                         Rockwall Texas 75087

 

Solotech U.S                     . Corporation                                          7970 S Valley View Boulevard                         Non-responsive

Ste. 100  

                                                                                                         Las Vegas Nevada 89139

 

Futurism Designs                                                               1115 Royal Lane                                                                   Non-responsive

                                                                                                         Dallas Texas 75229

 

Restoration Nation                                                               2700 Corzine Drive                                                                   Non-responsive

                                                                                                         Arlington Texas 76013

 

**Five firms were deemed non-responsive for not submitting a full proposal for the project.

 

OWNER/EXECUTIVE

 

Big Sky Construction Co., Inc.

 

Bob Long, President

 

MAP

 