File #: 24-2501    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/8/2024 In control: Dallas Water Utilities Department
On agenda: 10/8/2024 Final action:
Title: Authorize a professional services contract with Lockwood, Andrews & Newnam, Inc., to provide engineering and surveying services for flood management and storm drainage system improvements at 4 locations - Not to exceed $616,214.00 - Financing: 2024 Certificate of Obligation Fund
Indexes: 1
Attachments: 1. List, 2. Map, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     October 8, 2024

COUNCIL DISTRICT(S):                     1

DEPARTMENT:                     Dallas Water Utilities Department

EXECUTIVE:                     Dev Rastogi

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Lockwood, Andrews & Newnam, Inc., to provide engineering and surveying services for flood management and storm drainage system improvements at 4 locations - Not to exceed $616,214.00 - Financing: 2024 Certificate of Obligation Fund

 

Body

BACKGROUND

 

This action will authorize a professional services contract with Lockwood, Andrews & Newnam, Inc., to develop construction documents for flood management and storm drainage improvements in the El Tivoli Neighborhood along Plymouth Road. The planned improvements will occur at 4 locations, including El Tivoli Drive at Reverchon Drive, Plymouth Road between Avon Street and Bahama Drive, the El Tivoli Branch culvert at Plymouth Road, and the Lafayette Heights Branch culvert at Plymouth Road. A drainage relief system will be designed to improve the existing storm drainage in the El Tivoli Neighborhood at Reverchon Drive, two culverts along Plymouth Road at El Tivoli Branch and Lafayette Heights Branch will be upgraded to address roadway overtopping during storm events, and existing pipe crossings and outfalls will be upgraded along Plymouth Road from Avon to Bahama. The proposed improvements will address flooding issues attributed to inadequate storm drain infrastructure in the El Tivoli neighborhood and Plymouth Road

 

The services provided for this contract include project management, topographic and boundary surveys, easement identification and preparation of survey instruments as needed, subsurface utility exploration, geotechnical investigations, structural analysis, drainage studies including hydrologic and hydraulic stream and storm drain system modeling, development of conceptual and preliminary construction plans, and development of final construction plans and special specifications.

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

 

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                          December 2024

Complete Design                     December 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2025

FY 2026

Future Years

2024 Certificate of Obligation Fund

$616,214.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$616,214.00

Architecture & Engineering

34.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

38.77%

38.77%

$238,889.00

This contract exceeds the M/WBE goal.

Lockwood, Andrews & Newnam, Inc. - Local; Workforce - 34.88% Local

 

OWNER/EXECUTIVE

 

Lockwood, Andrews & Newnam, Inc.

 

Stephen A. Gilbreath, Chief Operations Officer

 