Legislation Details

File #: 26-2618A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 8/5/2026 In control: Dallas Water Utilities Department
On agenda: 9/23/2026 Final action:
Title: Authorize a construction services contract for the East Side Water Treatment Plant Residuals Handling Project, Phase II, located at 405 Long Creek Road, Sunnyvale, Texas – CLW Water Group, LLC, lowest responsible bidder of five - Not to exceed $22,442,000.00 - Financing: Water Capital Improvement G Fund ($2,892,286.97), Water Capital Improvement F Fund ($19,343,874.28), and Water Construction Fund ($205,838.75) *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: 200
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     September 23, 2026

COUNCIL DISTRICT(S):                     Outside

DEPARTMENT:                     Dallas Water Utilities Department

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for the East Side Water Treatment Plant Residuals Handling Project, Phase II, located at 405 Long Creek Road, Sunnyvale, Texas - CLW Water Group, LLC, lowest responsible bidder of five - Not to exceed $22,442,000.00 - Financing: Water Capital Improvement G Fund ($2,892,286.97), Water Capital Improvement F Fund ($19,343,874.28), and Water Construction Fund ($205,838.75)

 

*In alignment with Water and Wastewater Capital Improvement Program.

 

Body

BACKGROUND

 

The East Side Water Treatment Plant (ESWTP), located at 405 Long Creek Road, Sunnyvale, Texas, was originally constructed in the 1960s. With a treatment capacity of 440 million gallons per day, it is the largest of three water treatment plants serving Dallas Water Utilities customers. Residuals management at the plant has long presented operational challenges due to aging infrastructure and increasing solids loading from updated plant processes. 

 

Since the early 1990s, the ESWTP has primarily used a system of five on-site lagoons for residual management. However, a 2019 residuals project indicated that the remaining useful lagoon capacity would be reached by 2025. To address this limited capacity, the ESWTP Residuals Handling Improvements, Phase I project was awarded in 2021, which included construction of two new lagoons and a permanent structural concrete dewatering pad, along with plant drain modifications to separate residual streams, and extend lagoon life. Settling basin blowdown was redirected to the new lagoons, while filter backwash continued to the existing lagoons.

 

The next phase of improvement involves the existing lagoon embankments. Since the lagoons are hydraulically connected they cannot be isolated for maintenance or operational adjustments. To provide the operational flexibility identified in the Water Productions Strategic Plan, Phase II of the residuals handling improvement program will include installation of a new 48-inch diameter residuals bypass pipeline. This will allow shutdown and improvements to the existing lagoon system, while also supporting future recycling of the waste streams generated by filter backwash operations.

 

This action will authorize a construction services contract with CLW Water Group, LLC, for the East Side Water Treatment Plant Residuals Handling Project, Phase II. The project includes installation of a new 48-inch diameter residuals bypass pipeline, expansion of the existing residual pump station, installation of valves and electrical equipment, and upgrades to existing electrical, water, and control system necessary for the integration of the new infrastructure. Improvements will also include replacement of baffle walls, cleaning of accumulated solids, disinfection of clearwells, and modifications to the existing hydrogen peroxide system. These improvements are intended to enhance water quality, increase operational reliability, and improve the long-term functionality of the ESWTP residuals and clearwell systems. 

 

The following chart illustrates CLW Water Group, LLC’s contractual activities with the City of Dallas for the past three years:

 

                     AVI                     DWU                     PKR                     TPW

 

ProjectsCompleted                     0                     0                     0                     0

Active Projects                     0                     1                     0                     0

Change Orders                     0                     0                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          November 2026

Complete Construction                     November 2028

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

Information about this item was provided to the Transportation and Infrastructure Committee on September 14, 2026.

 

FISCAL INFORMATION

 

Fund

FY2026

FY2027

Future Years

Water Capital Improvement F Fund

$19,343,874.28

$0.00

$0.00

Water Capital Improvement G Fund

$2,892,286.97

$0.00

$0.00

Water Construction Fund

$205,838.75

$0.00

$0.00

Total

$22,442,000.00

$0.00

$0.00

 

LOCAL PARTICIPATION

 

Prime

Status

Workforce %

CLW Water Group, LLC

Local

33.33%

 

 

 

PROCUREMENT INFORMATION

 

The following five bids with quotes were received on July 17, 2026:

 

*Denotes successful bidder

 

                                                               Alter. Nos. 1A,

Bidders                     Base Bid Amount                                            1B, and 1C                                                     Total Bid

 

*CLW Water Group, LLC                     $12,748,000.00                             $9,694,000.00                     $22,422,000.00

 4350 Alpha Road, Suite 100

 Richardson, Texas 75104

Walsh Construction Company II, LLC                     $13,926,079.00                                          $7,844,624.00                                          $21,770,703.00

 dba Archer Western                     

Schofield Civil Construction, LLC                     $14,587,500.00                                          $6,722,300.00                                          $21,309,800.00

Urban Infraconstruction, LLC                     $16,238,598.00                                          $9,836,058.00

Gadberry Construction Company, Inc.                                                                                                                                                   ***Withdrew Bid

 

***Gadberry Construction Company, Inc. withdrew their bid after bids were opened.

 

Note: Lowest responsible bidder is determined by the base bid per the solicitation. The total award amount includes the base bid amount and additive alternates of $9,694,000.00 for a total award amount of $22,442,000.00.

 

OWNER/EXECUTIVE

 

CLW Water Group, LLC

 

David Caldwell, President

 

MAP

 

Attached