Dallas Logo
File #: 23-1978    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/24/2023 In control: Department of Public Works
On agenda: 9/27/2023 Final action:
Title: Authorize a construction services contract for the construction of Street Reconstruction Group 17-5001 (list attached to the Agenda Information Sheet) - Estrada Concrete Company, LLC, lowest responsible bidder of four - Not to exceed $10,153,024.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($7,287,224.00), Water Construction Fund ($1,380,150.00), Wastewater Capital Improvement F Fund ($1,469,150.00), and Wastewater Construction Fund ($16,500.00)
Indexes: 5
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     September 27, 2023

COUNCIL DISTRICT(S):                     5

DEPARTMENT:                     Department of Public Works

EXECUTIVE:                     Dr. Robert Perez

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for the construction of Street Reconstruction Group 17-5001 (list attached to the Agenda Information Sheet) - Estrada Concrete Company, LLC, lowest responsible bidder of four - Not to exceed $10,153,024.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($7,287,224.00), Water Construction Fund ($1,380,150.00), Wastewater Capital Improvement F Fund ($1,469,150.00), and Wastewater Construction Fund ($16,500.00)

 

Body

BACKGROUND

 

This action will authorize a construction services contract with Estrada Concrete Company, LLC for the construction of two street reconstruction projects as Street Reconstruction Group 17-5001.

 

The project group scope will provide replacement of the existing deteriorating street asphalt pavement with reinforced concrete pavement, curb, gutter, sidewalk, driveway and alley approaches, paving marking, possible replacement of the drainage system, and water and wastewater improvements.

 

Following are the locations and construction cost for each project:

 

Project                     Council District                          Amount

Rosemont Road from                      5                     $2,533,714.00

South Buckner Boulevard

to Hillburn Drive

 

Rosemont Road from                     5                     $7,619,310.00

Hillburn Drive to

North Jim Miller Road

 

Estrada Concrete Company, LLC is a Hutchins-based corporation and is a registered vendor with the City of Dallas.

 

The following chart illustrates Estrada Concrete Company, LLC’s contractual activities with the City of Dallas for the past three years.

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     7                     1                     0                     0

Active Projects                     17                     2                     0                     0

Change Orders                     5                     1                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

If this project group is not awarded for construction at this time, the roadways will continue to deteriorate causing additional pavement cracking and potholes to form, creating additional maintenance costs for the City and potential damages to vehicles utilizing the roadways. Field conditions may also change, which will require modifications to the engineering design plans, requiring additional funding and time to address.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          January 2024

Complete Construction                      December 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Street and Transportation (A) Fund (2017 General Obligation Bond Funds

  $7,287,224.00

$0.00

$0.00

Water Construction Fund

$  1,380,150.00

$0.00

$0.00

Wastewater Capital Improvement F Fund

$  1,469,150.00

$0.00

$0.00

Wastewater Construction Fund

$       16,500.00

$0.00

$0.00

Total

$10,153,024.00

$0.00

$0.00

 

 

 

 

 

 

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$10,153,024.00

Construction

32.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

36.00%

100.00%

$10,153,024.00

This contract exceeds the M/WBE goal.

Estrada Concrete Company, LLC - Non-local; Workforce - 72.00% Local

 

PROCUREMENT INFORMATION

 

The following four bids were received and opened on July 21, 2023:

*Denotes successful bidder

 

Bidders                                                                                                           Bid Amount

*Estrada Concrete Company, LLC                     $10,153,024.00

 650 Skyline Drive

 Hutchins, Texas 75141

Camino Construction, L.P.                                                                                                          $14,970,692.00

XIT Paving & Construction, Inc.                                                                                    $17,114,330.00

Tiseo Paving Company                                                                                                         **Non-responsive

 

**Tiseo Paving Company was deemed non-responsive due to an incorrect bid schedule.

 

OWNER

 

Estrada Concrete Company, LLC

 

Francisco Estrada, President

 

MAPS

 

Attached