STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: August 11, 2021
COUNCIL DISTRICT(S): 5, 7, 8, 9
DEPARTMENT: Department of Public Works
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT
Title
Authorize an engineering services contract with Giles Engineering Associates, Inc. to provide construction material testing services during construction of (1) paving, drainage, water and wastewater improvements at Pemberton Hill Road and (2) the Alley Reconstruction Group 17-9001 Package A (list attached to the Agenda Information Sheet) - Not to exceed $103,501.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund)
Body
BACKGROUND
The Request for Qualifications (CIZ1917) was issued on September 16, 2020 for the construction material testing services. The consulting firm, Giles Engineers, Inc., was selected following a qualifications-based selection process in accordance with the City of Dallas procurement guidelines.
This action will authorize an engineering services contract for the construction material testing services for construction of the (1) paving, drainage, water and wastewater improvements at Pemberton Hill Road (PB17VA10) and (2) Alley Reconstruction Group 17-9001 Package A located in Alleys between: (a) Cotillion Drive and Bon Park Court (PB17V069); (b) Buchannan Drive and Fergusson Road (PB17V00); (c) Dumbarton Drive and Glen Cross Drive (PB7V071); (d) Glen Cross Drive and Drummond Drive (PB17V072); (e) Bon Park and Parader Court. These testing services are required to assure that the material utilized during construction is in conformance with the quality required by the project specifications.
Giles Engineering Associates, Inc. is a registered vendor and has an office located within the corporate city limits of Dallas, Texas.
ESTIMATED SCHEDULE OF PROJECT
Begin Testing September 2021
Complete Testing September 2023
PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)
This item has no prior action.
FISCAL INFORMATION
Fund |
FY 2021 |
FY 2022 |
Future Years |
Street and Transportation (A) Fund (2017 General Obligation Bond Fund) |
$103,501.00 |
$0.00 |
$0.00 |
Pemberton Hill Road
Project Council District Amount
Pemberton Hill Road from South Great Trinity 5, 7, 8 $79, 350.00
Forest Way to Lake June Road
Alley Reconstruction Group 17-9001
Project Council District Amount
(11133-11139) Cotillion Drive & 9 $ 4,041.00
3609 Bon Park Court
(11205-11335) Buchanan Drive & 9 $ 5,522.00
(11200-11298) Ferguson Road
(11306-11340) Dumbarton Drive & 9 $ 4,611.00
(11323-11357) Glen Cross Drive
(11312-11344) Glen Cross Drive & 9 $ 6,636.00
(11341-11367) Drummond Drive
(3609-3615) Bon Park Court & 9 $ 3,341.00
(3608-3614) Parader Court
M/WBE INFORMATION
In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:
Contract Amount |
Procurement Category |
M/WBE Goal |
M/WBE % |
M/WBE $ |
$103,501.00 |
Architecture & Engineering |
34.00% |
100.00% |
$103,501.00 |
• This contract exceeds the M/WBE goal. |
• Giles Engineering Associates, Inc. - Local; Workforce -100.00% Local |
OWNER
Giles Engineering Associates, Inc.
Rodolfo Lomas, PE, Branch Manager
MAPS
Attached