Title: Authorize an increase in the construction services contract with SYB Construction Co., Inc., for the emergency replacement of a 60-inch diameter sanitary sewer pipeline behind 11400 Central Expressway - Not to exceed $676,310.00, from $21,003,141.50 to $21,679,451.50 - Financing: Wastewater Construction Fund
Indexes: 10
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 12, 2024

COUNCIL DISTRICT(S):                     10

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize an increase in the construction services contract with SYB Construction Co., Inc., for the emergency replacement of a 60-inch diameter sanitary sewer pipeline behind 11400 Central Expressway - Not to exceed $676,310.00, from $21,003,141.50 to $21,679,451.50 - Financing: Wastewater Construction Fund

 

Body

BACKGROUND

 

Dallas Water Utilities (DWU) owns and operates a 60-inch diameter concrete sewer pipeline near the Cottonwood Trail behind 11400 Central Expressway. The existing pipeline was built in 1972 and has structurally failed, forming a sink hole at this location. There are two 48-inch diameter sanitary sewer pipelines discharging into this interceptor.

 

DWU investigated the 60-inch interceptor from manhole to manhole and found the pipe to be in very poor condition. The inspection report revealed that the top part of the pipeline has deteriorated (visible rebar and missing concrete pieces) and the bottom part was not visible due to high flows. The depth of the pipeline is 23 feet, and the peak flow is 55 million gallons per day. A 9-foot segment of pipe is missing where the sinkhole has surfaced and approximately 400 feet of the wastewater pipeline needs emergency replacement.

 

Due to the poor condition of the pipeline, its depth, the high volume of wastewater flow, and the adverse site conditions, the resources of a private construction company will be necessary. DWU received quotes from contractors with experience in completing similar repairs. SYB Construction Co., Inc. provided the best quote to complete the work and submitted a final cost proposal of $676,310.00 on May 16, 2024. The estimate was reviewed by DWU and found to be a reasonable cost for the significance and difficulty of the work to be performed. Given the failure of the existing pipeline and threat of a more extensive structural failure that would impact the Cottonwood Trail and cause a Sanitary Sewer Overflow, DWU recommends immediately moving forward with the work utilizing the services of SYB Construction Co., Inc.

 

This action will authorized Changer Oder No. 1 to the construction services contract with SYB Construction Co., Inc. for emergency replacement of a 60-inch diameter sanitary sewer pipeline behind 11400 Central Expressway, in an amount not to exceed $676,310.00, increasing the contract amount from $21,003,141.50 to $21,679,451.50.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                                          June 2024

Complete Construction                     August 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On November 9, 2022, the City Council authorized a construction services contract for the installation and rehabilitation of water and wastewater mains, the replacement of water transmission valves, and the extension of water and wastewater mains to unserved areas at 45 locations by Resolution No. 22-1699.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Wastewater Construction Fund

$676,310.00

$0.00

$0.00

 

Construction                                                                                                         $21,003,141.50

Change Order No. 1 (this action)                                          $     676,310.00

 

Total Project Cost                                                                                    $21,679,451.50

 

OWNER

 

SYB Construction Co., Inc.

 

Brian Wood, Vice President

 

MAP

 

Attached