File #: 21-1955    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 10/4/2021 In control: Water Utilities Department
On agenda: 12/8/2021 Final action:
Title: Authorize an increase in the construction services contract with Oscar Renda Contracting, Inc. for additional work associated with the rehabilitation of wastewater interceptors at three locations (list attached to the Agenda Information Sheet) - Not to exceed $3,773,159.22, from $22,436,985.50 to $26,210,144.72 - Financing Wastewater Capital Improvement F Fund ($3,273,159.22) and Wastewater Construction Fund ($500,000.00)
Indexes: 8
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     December 8, 2021

COUNCIL DISTRICT(S):                     8

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

title

Authorize an increase in the construction services contract with Oscar Renda Contracting, Inc. for additional work associated with the rehabilitation of wastewater interceptors at three locations (list attached to the Agenda Information Sheet) - Not to exceed $3,773,159.22, from $22,436,985.50 to $26,210,144.72 - Financing Wastewater Capital Improvement F Fund ($3,273,159.22) and Wastewater Construction Fund ($500,000.00)

 

body

BACKGROUND

 

On September 26, 2018, City Council authorized a construction services contract with Oscar Renda Contracting, Inc. for the rehabilitation of approximately 12,515 feet of critical wastewater interceptors with identified condition deficiencies. The project includes the rehabilitation of 42-inch, 54-inch, and 120-inch wastewater interceptors, point repairs to an existing 72-inch wastewater interceptor, and the construction of reinforced concrete retaining walls to protect these critical interceptors from continued erosion of the adjacent river bank.

 

During construction, the contractor encountered conditions that could not have been anticipated at the time of bid. The existing 120-inch pipeline was found to have unexpected bends and concrete encasement, the 42-inch pipeline required removal of a failed liner section, a section of sheet piling and flowable fill was required to protect the existing 72-inch until the protective wall could be completed, and additional work is required to properly rehabilitate some manholes along the 72-inch pipeline. These unforeseen conditions have required the procurement of special pipe joints, more extensive wastewater flow control and specialized rehabilitation methods, extended labor, and additional time to complete the project.

 

Dallas Water Utilities and the engineer for the project have reviewed these conditions and determined that the changes being implemented by the contractor are necessary to complete the contract work. Oscar Renda Contracting, Inc., has provided an acceptable proposal for these changes and this action will authorize Change Order No. 1 to the construction services contract. Approval of this item will allow for the successful completion of the project and reduce the likelihood of failure for the targeted wastewater interceptors.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Construction                     November 2018

Complete Construction                     March 2022

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On September 26, 2018, City Council authorized a construction services contract with Oscar Renda Contracting, Inc. for the rehabilitation of wastewater mains at three locations by Resolution No. 18-1406.

 

FISCAL INFORMATION

 

Fund

FY 2022

FY 2023

Future Years

Wastewater Capital Improvement F Fund

$3,273,159.22

$0.00

$0.00

Wastewater Construction Fund

$   500,000.00

$0.00

$0.00

Total

$3,773,159.22

$0.00

$0.00

 

Construction                                                                                                         $22,436,985.50

Change Order No. 1 (this action)                                          $  3,773,159.22

 

Total Project Cost                                                                                    $26,210,144.72

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$3,773,159.22

Construction

25.00%*

10.34%

$390,000.00

*This item reflects previous Business Inclusion and Development Policy M/WBE goal.

This contract does not meet the M/WBE goal, but complies with good faith efforts

Change Order No. 1 - 23.59% overall M/WBE participation

Oscar Renda Contracting, Inc. - Local; Workforce - 0.00% Local

 

OWNER

 

Frank Renda, President

 

MAPS

 