File #: 26-1005A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 3/11/2026 In control: Department of Transportation and Public Works
On agenda: 5/13/2026 Final action:
Title: Authorize the (1) acceptance of a grant from the U.S. Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant (STBG) Program (Agreement No. CSJ 0918-47-557, Assistance Listing No. 20.205) in the amount of $1,820,000.00 as federal participation in the total project cost of $1,902,094.00, which includes $1,782,000.00 in Federal reimbursement to the City, $38,000.00 as Federal participation for direct state cost, $2,094.00 as State participation for indirect state cost, and $80,000.00 local match being done through in-house design, plus the use of 300,000 regional Transportation Development Credits as local participation, excluding any cost overruns, for the construction of intersection improvements including the removal of free-flow right-turn lanes and installation of pedestrian enhancements including pavement markings and median refuge islands along East Camp Wisdom Road at University ...
Indexes: 3, 8
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     May 13, 2026

COUNCIL DISTRICT(S):                     3, 8

DEPARTMENT:                     Department of Transportation and Public Works

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize the (1) acceptance of a grant from the U.S. Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant (STBG) Program (Agreement No. CSJ 0918-47-557, Assistance Listing No. 20.205) in the amount of $1,820,000.00 as federal participation in the total project cost of $1,902,094.00, which includes $1,782,000.00 in Federal reimbursement to the City, $38,000.00 as Federal participation for direct state cost, $2,094.00 as State participation for indirect state cost, and $80,000.00 local match being done through in-house design, plus the use of 300,000 regional Transportation Development Credits as local participation, excluding any cost overruns, for the construction of intersection improvements including the removal of free-flow right-turn lanes and installation of pedestrian enhancements including pavement markings and median refuge islands along East Camp Wisdom Road at University Hills Boulevard in the City of Dallas; (2) establishment of appropriations in the amount of $1,782,000.00 in the TxDOT STBG East Camp Wisdom Road at University Hills Grant Fund;  (3) receipt and deposit of funds in the amount of $1,782,000.00 into the TxDOT STBG East Camp Wisdom Road at University Hills Grant Fund; and (4) execution of the Advance Funding Agreement with TxDOT and all terms, conditions, and documents required by the agreement - Total amount of $1,782,000.00 - Financing: TxDOT STBG East Camp Wisdom Road at University Hills Grant Fund

 

*In alignment with Vision Zero Plan.

 

Body

BACKGROUND

 

The City of Dallas desires to enter into an Advanced Funding Agreement (AFA) with the TxDOT for intersection and pedestrian safety improvements along East Camp Wisdom Road at University Hills Boulevard funded through the Federal Highway Administration Highway Safety Improvement Program.

 

 

 

The estimated total project cost is $1,902,094.00, which includes $1,782,000.00 in Federal reimbursement to the City of Dallas, $38,000.00 as Federal participation for direct state cost, $2,094.00 as State participation for indirect state cost, and $80,000.00 local match being done through in-house design, plus the use of 300,000 regional Transportation Development Credits as local participation. The City of Dallas is the lead agency to administer the construction of the project pursuant to the terms of the AFA. The City of Dallas will be responsible for any non-reimbursable costs and 100 percent of project cost overruns that exceed the federal funding maximum obligated amount.

 

This action will authorize an AFA with TxDOT for the construction of intersection improvements, including the removal of free-flow right-turn lanes and installation of pedestrian enhancements such as pavement markings and median refuge islands along East Camp Wisdom Road at University Hills Boulevard within the City of Dallas, utilizing a combination of Federal funding and City funds, with state participation and Transportation Development Credits.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                                                August 2026

Complete Design                                                               December 2028

Begin Construction                                                                May 2028

Complete Construction                                          November 2030

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2026

FY 2027

Future Years

TxDOT STBG East Camp Wisdom Road at University Hills Grant Fund

$100,000.00

$300,000.00

$1,382,000.00

 

Federal Participation (STBG)                                          $1,782,000.00

Federal Participation (Direct State Cost)                     $     38,000.00

Indirect State Participation                                                               $       2,094.00

Local Participation                                                                                    $     80,000.00

 

Total Project Cost                                                                                    $1,902,094.00

 

Council District                                               Amount

 

3                                               $   475,523.50

8                                               $1,426,570.50

 

      Total                                               $1,902,094.00

 

 