Legislation Details

File #: 26-3314A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 10/8/2026 In control: Dallas Water Utilities Department
On agenda: 12/9/2026 Final action:
Title: Authorize a professional services contract with Nathan D. Maier Consulting Engineers, Inc. to provide engineering services for storm drainage improvements at five locations (list attached to the Agenda Information Sheet) - Not to exceed $993,759.00 – Financing: Storm Drainage Management Commercial Paper Fund *In alignment with Capital Improvement Program.
Indexes: 1, 3
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

PILLAR:                     Sustainable

AGENDA DATE:                     December 9, 2026

COUNCIL DISTRICT(S):                     1, 3

DEPARTMENT:                     Dallas Water Utilities Department

PRIORITY:                     Infrastructure

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Nathan D. Maier Consulting Engineers, Inc. to provide engineering services for storm drainage improvements at five locations (list attached to the Agenda Information Sheet) - Not to exceed $993,759.00 - Financing: Storm Drainage Management Commercial Paper Fund

 

*In alignment with Capital Improvement Program.

 

Body

BACKGROUND

 

The City of Dallas has identified areas across the city requiring storm drainage improvements to address flooding and strengthen infrastructure due to structural deterioration. These areas were identified to have inadequate infrastructure to limit flooding and require engineering evaluations and design for infrastructure improvements. This action will authorize a professional services contract with Nathan D. Maier Consulting Engineers, Inc. to provide engineering services for storm drainage improvements at five locations.

 

The locations included in this contract are Cedar Creek Channel near 908 S. Rosemont, Chalk Hill Branch at Counts Boulevard, the Van Buren Avenue - Cedar Hill Avenue Area, the Sage Valley Lane - Wisteria Street Area, and the Mapleleaf Circle/Mapleleaf Lane Area. Improvements expected include channel repairs to Cedar Creek Channel from South Rosemont Avenue to South Montclair Avenue, the installation of a new bridge or culvert at Chalk Hill Branch and Counts Boulevard, and upgrades to existing drainage systems at the other locations.

 

Engineering services associated with this contract will include the evaluation and design for the replacement of aging drainage infrastructure, storm drainage improvements, and channel stabilization. The scope of this contract includes project management, topographic and boundary surveys, easement document preparation, environmental permitting, subsurface utility exploration, geotechnical investigations, structural analysis, hydraulic analysis, and development of conceptual and final construction plans and special specifications.

 

Nathan D. Maier Consulting Engineers was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                                          February 2027

Complete Services                                          March 2032

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

Information about this item was provided to the Transportation and Infrastructure Committee on November 18, 2026.

 

FISCAL INFORMATION

 

Fund

FY 2027

FY 2028

Future Years

Storm Drainage Management Commercial Paper Fund

$993,759.00

$0.00

$0.00

 

Council District                                            Amount

 

1                                                    $635,630.00

3                                                   $358,129.00

 

       Total                                                   $993,759.00

 

BUSINESS PARTICIPATION

 

Prime

Status

Workforce %

Nathan D. Maier Consulting Engineers, Inc.

Local

27.78%

 

OWNER/EXECUTIVE

 

Nathan D. Maier Consulting Engineers, Inc.

 

Jean Maier Dean, P.E., President and Chief Executive Officer

 

MAPS

 

Attached