File #: 24-1558    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/1/2024 In control: Department of Transportation
On agenda: 6/12/2024 Final action:
Title: Authorize the (1) acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-484, Assistance Listing No. 20.205) in the amount of $3,000,000.00 as federal share in the total project cost of $3,135,240.00 (includes $2,940,000.00 in Federal reimbursement, $60,000.00 in Direct State Cost, $135,240.00 in Indirect State Cost, and the City of Dallas' portion covered by the use of 600,000 regional Transportation Development Credits in lieu of a local cash match) for engineering costs to reconstruct the intersection at Harry Hines Boulevard and Mockingbird Lane in the City of Dallas; (2) receipt and deposit of funds in the amount of $2,940,000.00 in the FY24 TxDOT Surface Transportation Block Grant Program Fund; (3) establishment of appropriations in the amount of $2,940,000.00 in the FY24 TxDOT Surface Transportation...
Indexes: 2
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     June 12, 2024

COUNCIL DISTRICT(S):                     2

DEPARTMENT:                     Department of Transportation

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize the (1) acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-484, Assistance Listing No. 20.205) in the amount of $3,000,000.00 as federal share in the total project cost of $3,135,240.00 (includes $2,940,000.00 in Federal reimbursement, $60,000.00 in Direct State Cost, $135,240.00 in Indirect State Cost, and the City of Dallas’ portion covered by the use of 600,000 regional Transportation Development Credits in lieu of a local cash match) for engineering costs to reconstruct the intersection at Harry Hines Boulevard and Mockingbird Lane in the City of Dallas; (2) receipt and deposit of funds in the amount of $2,940,000.00 in the FY24 TxDOT Surface Transportation Block Grant Program Fund; (3) establishment of appropriations in the amount of $2,940,000.00 in the FY24 TxDOT Surface Transportation Block Grant Program Fund; and (4) execution of the Advance Funding Agreement with TxDOT and all terms, conditions, and documents required by the grant agreement - Total amount of $2,940,000.00 - Financing: Texas Department of Transportation Grant Funds

 

Body

BACKGROUND

 

The North Central Texas Council of Governments (NCTCOG), in coordination with local partners including the City of Dallas, has been developing a master transportation plan for the Harry Hines corridor from Loop 12/Northwest Highway to north of Spur 366 (Woodall Rodgers Freeway). This study will serve as a guide for future improvements of the roadway to improve connectivity, accessibility, and safety along the corridor.

 

As a result of this study, on October 12, 2023, the NCTCOG’s Regional Transportation Council authorized federal funding for engineering costs to reconstruct the intersection at Harry Hines Boulevard and Mockingbird Lane.

 

 

 

The Texas Transportation Commission passed Minute Order No. 116522, authorizing the State to undertake and complete a highway improvement or other transportation project generally described as engineering to reconstruct an interchange, which included this project.

 

The City of Dallas desires to enter into an Advance Funding Agreement (AFA) with TxDOT to accept federal funding through the Surface Transportation Block Grant (STBG) Program for engineering costs to reconstruct the intersection at Harry Hines Boulevard and Mockingbird Lane in the City of Dallas (“Project”).

 

The City is the lead agency to administer the environmental assessment and engineering of the Project pursuant to the terms of the AFA.

 

The Project is funded 100 percent with federal sources, and the use of 600,000 regional Transportation Development Credits (“TDCs”) will serve as the City’s participation in lieu of a local cash match.

 

TDCs are a financial accounting tool approved by the Federal Highway Administration permitting the use of federal funding without the requirement of a cash match. These credits are non-cash credits allocated to States as a representative value to account for toll road and tolled managed lanes that benefit the federal system.

 

This action will authorize an AFA with TxDOT for environmental assessment and engineering of the Project utilizing a combination of federal funding and TDCs.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                                               July 2024

Complete Design                                          July 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Texas Department of Transportation Grant Funds

$500,000.00

$2,440,000.00

$0.00

 

Federal Participation (STBG)                     $2,940,000.00

Federal Participation (Direct State Cost)                     $     60,000.00

Indirect State Participation                     $   135,240.00

 

Total Project Cost                     $3,135,240.00

 

MAP

 

Attached