STRATEGIC PRIORITY: Quality of Life, Arts & Culture
AGENDA DATE: September 13, 2023
COUNCIL DISTRICT(S): 2
DEPARTMENT: Park & Recreation Department
EXECUTIVE: John D. Jenkins
______________________________________________________________________
SUBJECT
Title
Authorize a professional services contract with SWA Group for (1) surveying and platting services for park in the Cedars Park, near the intersection of South St. Paul Street and Beaumont Street; and (2) site assessment and analysis of the Old City Park site located at 1515 South Harwood Street - Not to exceed $262,840.00 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund)
Body
BACKGROUND
Old City Park is where the City of Dallas’ first city park stood in 1876. It was the location of the city’s first zoo. Browder Springs, which now flows underground, was the first water supply with a wooden water main carrying water to the city. The existing buildings were relocated to Old City Park from throughout North Central Texas.
This contract will include surveying, platting for park in the Cedars Park near the intersection of South St. Paul Street and Beaumont Street, and site assessment and site analysis of the Old City Park site located at 1515 South Harwood Street. SWA Group will inventory existing conditions and analyze the existing vehicular traffic, vegetation, pedestrian traffic, stormwater drainage, paved surfaces, structures above ground and utilities below ground.
ESTIMATED SCHEDULE OF PROJECT
Begin Assessment September 2023
Complete Assessment August 2024
PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)
On August 17, 2023, the Park and Recreation Board authorized a professional services contract with SWA Group for (1) surveying and platting services for park in the Cedars Park, near the intersection of South St. Paul Street and Beaumont Street; and (2) site assessment and analysis of the Old City Park site.
FISCAL INFORMATION
Fund |
FY 2023 |
FY 2024 |
Future Years |
Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund) |
$262,840.00 |
$0.00 |
$0.00 |
M/WBE INFORMATION
In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:
Contract Amount |
Procurement Category |
M/WBE Goal |
$262,840.00 |
Architecture & Engineering |
34.00% |
M/WBE Subcontracting % |
M/WBE Overall % |
M/WBE Overall Participation $ |
62.91% |
62.91% |
$165,340.00 |
• This contract exceeds the M/WBE goal. |
• SWA Group - Local; Workforce - 64.29% Local |
PROCUREMENT INFORMATION
In accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines, SWA Group was selected as the most qualified consultant for this project.
OWNER
SWA Group
Chuck McDaniel, Principal
MAP
Attached