Skip to main content
Dallas Logo
File #: 23-3138    Version: 1 Name:
Type: UPCOMING AGENDA ITEMS Status: Agenda Ready
File created: 11/29/2023 In control: Transportation and Infrastructure Committee
On agenda: 12/5/2023 Final action:
Title: Water Utilities: Authorize a construction services contract for the installation of a 2.0-million-gallon elevated water storage tank, 20-inch diameter electrically operated butterfly valve and vault, and a 30-inch diameter electrically operated butterfly valve and vault - Landmark Structures, I LP, lowest responsible bidder of two - Not to exceed $16,790,000.00 - Financing: Water Capital Improvement F Fund
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Water Utilities: Authorize a construction services contract for the installation of a 2.0-million-gallon elevated water storage tank, 20-inch diameter electrically operated butterfly valve and vault, and a 30-inch diameter electrically operated butterfly valve and vault - Landmark Structures, I LP, lowest responsible bidder of two - Not to exceed $16,790,000.00 - Financing: Water Capital Improvement F Fund