Authorize a three-year service price agreement for cured-in-place pipe and manhole rehabilitation services for the Dallas Water Utilities Department - Insituform Technologies, LLC in the estimated amount of $11,287,300.00 and Infrastructure Rehabilitation USA, Inc. in the estimated amount of $1,069,200.00, most advantageous proposers of five - Total estimated amount of $12,356,500.00 - Financing: Wastewater Construction Fund (subject to annual appropriations)
Body
BACKGROUND
This action does not encumber funds; the purpose of a service price agreement is to establish firm pricing for services, for a specific term, which are ordered on an as needed basis according to annual budgetary appropriations. The estimated amount is intended as guidance rather than a cap on spending under the agreement, so that actual need combined with the amount budgeted will determine the amount spent under this agreement.
This service price agreement will provide for cured-in-place pipe and manhole rehabilitation services for the Dallas Water Utilities Department (DWU). This seamless pipe repair restores structural integrity to existing lines, eliminates weakened joints, and prevents root intrusion. The cured-in-place method creates a wall-to-wall seamless pipe lining inside the existing damaged pipe with limited excavation at the repair site. This method reduces repair time and allows DWU to maintain continuous service to the residents. The cured-in-place method will be used to rehabilitate wastewater mains ranging in size from six to sixty inches. The lining rehabilitation of sanitary sewer manholes process will provide structural rehabilitation to manhole walls, eliminate inflow, infiltration, exfilt...