Skip to main content
Dallas Logo
File #: 23-1341    Version: 1 Name:
Type: BRIEFING ITEMS Status: Agenda Ready
File created: 5/9/2023 In control: Transportation and Infrastructure Committee
On agenda: 5/15/2023 Final action:
Title: Transportation: Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-390, CFDA No. 20.205) as Federal share in the total project cost of $2,406,614.00, which includes $1,840,000.00 as Federal participation for environmental assessment, engineering, construction, and direct state costs, $106,614.00 as State participation for indirect state costs, and $460,000.00 as local participation for environmental assessment, engineering, construction, and direct state costs paid to TxDOT prior to construction for cost related to the preparation of preliminary engineering (schematic and environmental), final design, plans, specifications and estimates, and the reconstruction of Lake June Road from U.S. 175 to Gillette Street including rehabilitation of a 6 to 4 lane roadway including full depth pave...
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Transportation: Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-390, CFDA No. 20.205) as Federal share in the total project cost of $2,406,614.00, which includes $1,840,000.00 as Federal participation for environmental assessment, engineering, construction, and direct state costs, $106,614.00 as State participation for indirect state costs, and $460,000.00 as local participation for environmental assessment, engineering, construction, and direct state costs paid to TxDOT prior to construction for cost related to the preparation of preliminary engineering (schematic and environmental), final design, plans, specifications and estimates, and the reconstruction of Lake June Road from U.S. 175 to Gillette Street including rehabilitation of a 6 to 4 lane roadway including full depth pavement repair to include bike lanes, sidewalks, lighting, and traffic signal at Gillette Street and Lake June Road; (2) a local match in the amount of $460,000.00; (3) the disbursement of funds in the amount of $460,000.00 to TxDOT from the Coronavirus State and Local Fiscal Recovery Fund; and (4) execution of the Advance Funding Agreement with TxDOT and all terms, conditions, and documents required by the grant agreement - Total amount of $460,000.00 - Financing: Coronavirus State and Local Fiscal Recovery Fund