Dallas Logo
File #: 25-119A    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 12/23/2024 In control: Dallas Water Utilities Department
On agenda: 4/9/2025 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Pacheco Koch Consulting Engineers, LLC dba Pacheco Koch, a Westwood Company, to provide additional engineering services necessary for the development of construction plans, specifications and contract documents, and construction observation for the Cedar Creek Bridge replacement at Moore Street and to prepare additional survey documents for erosion control easements at Holliday Road and West Kiest Boulevard - Not to exceed $454,105.00, from $221,579.00 to $675,684.00 - Financing: Storm Drainage Management Capital Construction Fund
Indexes: 3, 4
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Sustainable
AGENDA DATE: April 9, 2025
COUNCIL DISTRICT(S): 3, 4
DEPARTMENT: Dallas Water Utilities Department
EXECUTIVE: Dev Rastogi
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Pacheco Koch Consulting Engineers, LLC dba Pacheco Koch, a Westwood Company, to provide additional engineering services necessary for the development of construction plans, specifications and contract documents, and construction observation for the Cedar Creek Bridge replacement at Moore Street and to prepare additional survey documents for erosion control easements at Holliday Road and West Kiest Boulevard - Not to exceed $454,105.00, from $221,579.00 to $675,684.00 - Financing: Storm Drainage Management Capital Construction Fund

Body
BACKGROUND

On August 10, 2022, the City Council authorized a professional services contract with Pacheco Koch Consulting Engineers, LLC dba Pacheco Koch, a Westwood Company, for the engineering evaluation and design of storm drainage and erosion control improvements at four locations. Initial engineering services for the Cedar Creek Bridge at Moore Street included a preliminary design report to determine potential drainage improvement alternatives. A preferred alternative was selected, and it is now necessary to complete the design, prepare construction plans, and provide construction phase services. The existing bridge at Moore Street over Cedar Creek has a level of service that is less than the 10-year storm event. The proposed improvements consist of replacing the bridge so that the deck is raised above the 100-year storm elevation and the construction of retaining walls to support the embankment.

Additional engineering services are also necessary at two locations for proposed erosion control improvements. Easement documents will be prepared for 2412 West Kiest Boulevard and 3445, 3449, 3605, and 3621 Holli...

Click here for full text