Legislation Details

File #: 26-2412A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 7/20/2026 In control: Dallas Water Utilities Department
On agenda: 9/23/2026 Final action:
Title: Authorize a professional services contract with Wade Trim, Inc. to provide engineering services associated with the Lift Station and Diversion Structure Improvements Project - Not to exceed $1,844,612.00 - Financing: Wastewater Capital Improvement G Fund ($1,740,000.00) and Wastewater Capital Improvement F Fund ($104,612.00) *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: Citywide
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
PILLAR: Sustainable
AGENDA DATE: September 23, 2026
COUNCIL DISTRICT(S): Citywide
DEPARTMENT: Dallas Water Utilities Department
PRIORITY: Infrastructure
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Wade Trim, Inc. to provide engineering services associated with the Lift Station and Diversion Structure Improvements Project - Not to exceed $1,844,612.00 - Financing: Wastewater Capital Improvement G Fund ($1,740,000.00) and Wastewater Capital Improvement F Fund ($104,612.00)

*In alignment with Water and Wastewater Capital Improvement Program.

Body
BACKGROUND

Dallas Water Utilities Department completed a Wastewater Facilities and Operations Strategic Plan in 2025 that outlined capital improvement recommendations based on a comprehensive review of existing facility conditions and needs. The assessment evaluated 16 lift stations and two diversion structures to identify deficiencies, assess asset conditions, and develop rehabilitation and replacement recommendations. Six of the lift stations were recommended for replacement, and future rehabilitation improvements were identified for the remaining lift stations. In addition, rehabilitation improvements were identified at both wastewater collection system diversion structures. Based on asset conditions, the improvements were prioritized into different capital improvement projects.

This action will authorize a professional services contract for the evaluation, design and construction administration of the first capital improvement package that includes the replacement of six lift stations and diversion structure improvements. The lift stations identified for replacement include the Seagoville Road, Industrial Boulevard, Regal Row, Rylie Road, Christopher Place, and Lucky Lane Lift Stations. Rehabilitation improvements will be designed for the Five Mile and Sunbeam Diversion Structures. In addition, the contract will include a cap...