Authorize (1) acquisition from Second 55 Venture, LLC., of a tract of land containing a total of approximately 43,175 square feet, located on Morrell Avenue near its intersection with Sargent Road for the Dallas Floodway Extension Project; and (2) an increase in appropriation in an amount not to exceed $52,120.00 in the Flood Protection and Storm Drainage Management Fund - Not to exceed $52,120.00 ($48,120.00, plus closing costs and title expenses not to exceed $4,000.00) - Financing: Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Fund)
Body
BACKGROUND
The City of Dallas is the owner and operator of the Dallas Levee System extending from the Elm and West Forks of the Trinity River through the main stem and terminating at Interstate Highway 20. This system is regulated by the U.S. Army Corps of Engineers (USACE). In addition to regulating the Dallas Levee System, the USACE and City have been cost participating in two separate federal projects to improve the public safety of the residents and businesses that are served by this system. The City is required to own, in fee simple, all parcels related to the Dallas Levee System.
In July 2018, the Dallas Levee System flood risk management projects included in the Modified Dallas Floodway Project (DF) and the Dallas Floodway Extension (DFE) were authorized for funding under the Supplemental Appropriation in the Bipartisan Budget Act of 2018- Public Law 115-123 (PL-115-123). This information has been presented to the City Council and provided in memorandum to the City Council at major milestones since the notification by the USACE. All work associated with the design and construction of these improvements is being performed by USACE...