Legislation Details

File #: 26-1608A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 4/30/2026 In control: Dallas Water Utilities Department
On agenda: 6/24/2026 Final action:
Title: Authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at Dallas Water Utilities Department's water distribution facilities - Not to exceed $3,290,060.00 - Financing: Water Capital Improvement G Fund *In alignment with Water and Wastewater Capital Improvement Program.
Indexes: Citywide
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
PILLAR: Sustainable
AGENDA DATE: June 24, 2026
COUNCIL DISTRICT(S): Citywide
DEPARTMENT: Dallas Water Utilities Department
PRIORITY: Infrastructure
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at Dallas Water Utilities Department's water distribution facilities - Not to exceed $3,290,060.00 - Financing: Water Capital Improvement G Fund

*In alignment with Water and Wastewater Capital Improvement Program.

Body
BACKGROUND

The Dallas Water Utilities Department (DWU) provides treated drinking water and fire protection to approximately 2.65 million people through an extensive water delivery system. DWU's water distribution infrastructure includes numerous potable water pump stations and pumps, water storage tanks, pressure reducing valves, and more than 5,000 miles of transmission and distribution mains. As these facilities age and system demands increase, DWU must continue to plan, prioritize, and implement strategic major maintenance improvements to ensure reliability, regulatory compliance, and operational efficiency across the water delivery network.

This action will authorize a professional services contract with Kimley-Horn and Associates, Inc. to provide engineering services associated with the assessment and preliminary design of improvements for the Sorcey Pump Station and major maintenance improvements at 22 additional water distribution facilities. The engineer will prepare a 30 percent preliminary design assessment for high-priority major maintenance improvements across these facilities, including Sorcey Pump Station, 19 additional pump stations, and three elevated storage tanks. The project will document existing conditions, evaluate facility needs, develop preliminar...