Dallas Logo
File #: 23-97    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 12/16/2022 In control: Department of Public Works
On agenda: 2/22/2023 Final action:
Title: Authorize Supplemental Agreement No. 2 to the professional services contract with Bridgefarmer & Associates, Inc. to provide additional engineering services on East Clarendon Drive from South Ewing Avenue to Upton Street and on South Ewing Avenue from Interstate Highway 35E to East Clarendon Drive - Not to exceed $231,980.00, from $1,228,581.20 to $1,460,561.20 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund)
Indexes: 4
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: February 22, 2023
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Public Works
EXECUTIVE: Dr. Robert Perez
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 2 to the professional services contract with Bridgefarmer & Associates, Inc. to provide additional engineering services on East Clarendon Drive from South Ewing Avenue to Upton Street and on South Ewing Avenue from Interstate Highway 35E to East Clarendon Drive - Not to exceed $231,980.00, from $1,228,581.20 to $1,460,561.20 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund)

Body
BACKGROUND

On April 10, 2019, City Council authorized a professional services contract with Bridgefarmer & Associates Inc., for the engineering design of paving, street widening, bicycle facilities, storm drainage, and water and wastewater improvements for the Thoroughfare Improvement Project, South Ewing Avenue from Interstate Highway (IH) 35E to East Clarendon Drive by Resolution No. 19-0493.

During the design of the South Ewing Avenue Project, a drainage study and analysis was performed to determine the necessary drainage improvements near the intersection of South Ewing Avenue and East Clarendon Drive. The study concluded that the intersection was below the Cedar Creek 100-year flood elevation. The engineer will design a new bridge or culvert over Cedar Creek crossing South Ewing Avenue and East Clarendon Drive to raise the roadways and the intersection above the 100-year flood elevation. Consequently, it was necessary to include the East Clarendon Drive Project as part of the project design. In addition, due to the drainage improvements to Cedar Creek, it is necessary to provide environmental engineering services.

On May 13, 2020, City Council authorized Supplemental Agreement No. 1 to the professional services contract with Bridgefarmer & Associates,...

Click here for full text