Skip to main content
Dallas Logo
File #: 25-2740A    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 9/10/2025 In control: Dallas Water Utilities Department
On agenda: 10/22/2025 Final action:
Title: Authorize an increase in the construction services contract with Rebcon LLC for additional work associated with the Bachman Dam and Spillway Improvement Project - Not to exceed $1,017,556.72, from $43,179,000.00 to $44,196,556.72 - Financing: Water Construction Fund
Indexes: 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
PILLAR: Sustainable
AGENDA DATE: October 22, 2025
COUNCIL DISTRICT(S):|910|DEPARTMENT: Dallas Water Utilities Department
PRIORITY: N/A
______________________________________________________________________
SUBJECT

Title
Authorize an increase in the construction services contract with Rebcon LLC for additional work associated with the Bachman Dam and Spillway Improvement Project - Not to exceed $1,017,556.72, from $43,179,000.00 to $44,196,556.72 - Financing: Water Construction Fund

Body
BACKGROUND

On September 27, 2023, the City Council authorized a construction services contract for the Bachman Dam and Spillway Improvement Project with Rebcon LLC. The project includes the rehabilitation of the Bachman dam and spillway to address regulatory flood capacity as well as structural and stability recommendations. These improvements will ensure dam safety and regulatory compliance, minimize flood risk, and allow residents to enjoy the lake for years to come. The rehabilitation improvements will significantly reduce the potential of a breach by replacing the existing service spillway to improve capacity along with moving and widening the auxiliary spillway to pass flood events safely. Additional improvements include hardening the earthen embankment to protect the dam and comply with Texas Commission Environmental Quality dam safety guidelines, replacement of the railroad bridge that spans the existing spillway used for deliveries to the Bachman Water Treatment Plant, and replacement of the trail along the top of the earthen dam.

A significant amount of the project has included excavation and earth work, structural improvements, and concrete work at the existing spillway, railroad bridge and Bachman Branch outfall. During the course of construction, additional work outside the scope of the original contract has been required to remove and replace unsuitable subgrade materials, clear vegetation downstream of the spillway to ensure proper water conveyance, and complet...